11
For Customer Service Call 1-888-996-2729
© 2013 Escalade S por t s
All Rights Reserved.
PARTS REQUIRED:
2 pcs -
H2
Allen Head Bolt
2 pcs -
P9
26.25” Base Tube Upright
6 pcs -
H5
Flat Washer
2 pcs -
P10
Front Leg Tube
2 pcs -
H6
Lock Nut
2 pcs -
P23
L-Joint Plastic Part
1 pc -
P8L
Left Connect Tube
1 pc -
T1
Allen Wrench
1 pc -
P8R
Right Connect Tube
1 pc -
T2
Wrench
16.
Install
P8L (Left)
and
P8R (Right)
Connect Tubes to
P7
Tubes using
H2
Allen Head Bolts,
H5
Flat Washers and
H6
Lock Nuts as shown in
FIGURE
8
.
Note: This is a pivot point. “Snug” tighten H6 Lock Nuts only. Make sure this assembly
pivots freely.
17.
Snap
P
9
Base Tube Uprights to
P8L
and
P8R
Connect Tubes using spring locks as shown in
FIGURE
8
.
18.
Snap
P23
L-Joint Plastic Parts to
P
9
Base Tubes using spring locks as shown in
FIGURE
8
.
1
9
.
Snap
P10
Front Leg Tubes to
P23
L-Joint Plastic Parts using spring locks as shown in
FIGURE
8
.
FIGURE 8
P10
P10
P23
P
9
P
9
P
8L
(Left)
P
8R (Right)
H2
H5
H5
H6
H5
H2
P
7
P
7
NOTE:
Be sure to attach
P8L
onto bottom hole as
shown.
NOTE:
Be sure to attach
P8R
onto bottom hole as shown.
NOTE:
Swedge must be
in this position for
correct assembly
NOTE:
Swedge must be
in this position for
correct assembly
Summary of Contents for M01480RW
Page 5: ...2 2013 ...