Overview 

The SunRise Home Battery is an Australian-made all-in-one battery system designed to optimise your 

customer’s electricity usage, reduce their electricity bill and also reduce theirr carbon footprint. 
The system, including solar panels, generates and stores electricity for use day & night, and includes a 

backup capability so that your customer’s essential loads remain powered during any blackout. 
You and your customer can monitor the system via RedEarth’s EMU app, available for both Apple and 

Android phones.  
There is also the option for your customer to use their electricity in other ways via RedEarth’s PPP 

(Privatel  Power  Plant),  to  generate  additional  income  such  as  through  Energy  Trading.  Contact 

RedEarth for additional information.  
RedEarth can also provide ongoing monitoring to ensure the system is operating correctly. 
The  SunRise  system  can  operate  without  batteries,  however  much  of  the  functionality  will  not  be 

available unless batteries are installed.  

 

With batteries, PV solar electricity generated during the 

day will be used by the home, excess electricity will be 

stored  in  the  battery  and  then  exported  to  the  grid, 

which reduces the electricity bill. In addition the battery 

ensures  essential  household  loads  (fridges,  lights  etc) 

can  be  powered  during  a  power  outage.  It  is  also  a 

requirement  for  accessing  the  features  of  RedEarth’s 

PPP. 

 

Without  batteries excess  PV  generated  during  the day 

can be exported to the grid, which reduces the electicity 

bill, however no electricity can be stored for later use. 

Note that the SunRise is designed so that batteries can 

easily  be  added at a  later date,  as  demand grows  and 

budgets allow. 

 

The SunRise system can also easily be retrofitted to an 

existing PV solar system that may already be installed at 

the home.  

All batteries added later must be of the same make and model and supplied by RedEarth to maintain 

the customer’s warranty. A maximum of 9 batteries can be added into the system totalling 31.95kWh. 

Battery size has the following effects on system operation, 

 

Emergency Power: At least 5 batteries (17.75kWh) must be installed for correct operation.  

 

Full Power: To have the maximum (10kW) power available from the battery system (e.g. 

during a power outage) the Sunrise must have seven (7) or more batteries installed. 

There 6 SunRise model numbers are based on the size of the battery installed, SRS-3xx NS for this 

model with external PV isolators. 
A total of 13.3kW of solar panels can be connected to the SunRise system, and be fully claimable via 

the government solar rebate scheme. Note that an additional PV inverter can also be added to 

increase the total size of the solar system. In a typical home with 3-phase wiring. Up to 20kW of 

additional PV inverters can be added, allowing a maximum of 39.9kW of solar panels to be installed. 

Note that this many panels will not all fit on a typical roof. Contact RedEarth for more information if 

you are looking for a larger grid-connected system. 
Finally, SunRise is certified to AS4777.2:2020 & IEC62109.1&2 & AS60950.1 and conforms to the 

Australian Battery Safety Guide. 
 

Summary of Contents for SunRise SRS-3 Series

Page 1: ...SunRise 3 Phase Home Battery System Model SRS 3xx NS Installation Manual...

Page 2: ...ith any other charger device or connect any devices directly to the DC battery bus unless approved by RedEarth In the event of a fire evacuate the area and call emergency services A dry agent fire ext...

Page 3: ...lators 12 Step 4 Electrical Connections 13 4 1 Solar 13 4 2 Battery 13 4 4 Auxiliary remote Earth Fault Alarm option 16 4 5 MSB Meter 16 Step 5 Understanding the Turn ON SHUTDOWN Procedure 17 Step 6 C...

Page 4: ...PV generated during the day can be exported to the grid which reduces the electicity bill however no electricity can be stored for later use Note that the SunRise is designed so that batteries can ea...

Page 5: ...332 NS x9 batteries 31 95kWh nominal The max number of batteries available SunRise Weight size and IP rating 414kg with 9x Lithium batteries 32kg per battery 126kg complete without batteries 99kg comp...

Page 6: ...tteries to deliver the full 10kW of back up power Also do not over load any one phase 4 Up to 3 arrays of PV solar panels are connected to the MC4 conectors pre terminated inside the unit Note that th...

Page 7: ...a safe location INSIDE LAYOUT The SunRise is divided into three main areas On the Lefthand side LHS is the Inverter in the middle are the batteries and the Battery Management Unit BMU and on the Righ...

Page 8: ...clips holding it in place to make space Middle area This area is where up to 9 x 3 55kWh HV Pylontech batteries are installed A complete set will have two stacks of batteries with five 5 on the left a...

Page 9: ...ands suitable for sealing around 25mm flexible conduit o 2x Three pole circuit breakers o Bolts for holding the batteries in place in the rack 2 per battery o Long DC cable Orange red and black plugs...

Page 10: ...Earth Fault Alarm 4 5 MSB Sungrow meter 5 Understanding Turn on Shutdown procedures 6 Commissioning the system turning on and programming and confirming system operation 7 Activating remote Monitorin...

Page 11: ...e around the system no doors or windows to comply with current installation standards See image at right if the system is within 300m of the wall Note the material that the wall is made of flammabilit...

Page 12: ...ctors installed in the system The design of the solar array should take this into account with the two stings connected to the larger MPPT having the same orientation and string length PV2 PV3 3 2 PV...

Page 13: ...ct polarity and VOC then plug the three strings into the correct MC4s in the system remembering that 2 3 strings need to be the same orientation and length as they are going to the same MPPT 4 2 BATTE...

Page 14: ...he orange orange plugs which should already be connected to the BMU Then install the supplied shorter battery cables with one orange and one black plug onto the appropriate battery terminals Note that...

Page 15: ...not overload the EPS circuit in the MSB with not essential loads As the output is floating the neutral cable of GRID side and EPS side must be connected together according to the wiring rules AS NZS_3...

Page 16: ...fter the main switch in the MSB including the neutral and will work as a pass though of all power going to and from the home The communication between the meter and the system can be made with a CAT5...

Page 17: ...ll cable entry glands of the SunRise The battery terminal connections on the Battery MCB are tight Check after transportation Check screws holding the lid down are in place and tight Pull on the vents...

Page 18: ...4 08 2022 The Shutdown Procedure is the reverse of the turn on procedure and is shown below This procedure can be found on the traffolyte label on the RHS of the unit 1 Turn OFF all AC circuit breaker...

Page 19: ...w 6 1 POWER UP THE SUNRISE SYSTEM Follow the procedure outlined in Step 5 Understanding the Turn ON Shutdown procedure above While it is powering up which can take 5 minutes you can download the Sungr...

Page 20: ...Date time used for some control operations o Software version confirm latest The screen shots below from the APP show the sequence to reach the System Parameters setting page where these key parameter...

Page 21: ...ils is also able to access this information to confirm the current settings via Local mode as well as remotely via the iSolarCloud webpage and APP 6 5 TEST THE OPERATION OF THE COMPLETE SYSTEM PRIOR T...

Page 22: ...EPS loads To activate By pass mode all breakers and isolators should be turned OFF and the Bypass switch should be put in the down position II 6 5 3 Fan Control Adjustment The thermostat is located in...

Page 23: ...ion the supplied antenna outside Pass the antenna cable through the 16mm hole in the SunRise Use the supplied 16mm gland to seal around the cable Remote monitoring and control is then available via Re...

Page 24: ...RedEarth You can receive regular relevant communications from RedEarth Other benefits include Access to RedEarth s PPP Private Power Plant and the stream of financial benefits available to the custome...

Page 25: ...SunRise 3ph NS Installation Manual SunRise 3ph NS Install Version 1 0 Page 25 of 32 Issue Date 14 08 2022 Appendix A Single Line Diagrams Single Line Diagram Power...

Page 26: ...SunRise 3ph NS Installation Manual SunRise 3ph NS Install Version 1 0 Page 26 of 32 Issue Date 14 08 2022 Single Line Diagram Communications...

Page 27: ...SunRise 3ph NS Installation Manual SunRise 3ph NS Install Version 1 0 Page 27 of 32 Issue Date 14 08 2022 Single Line Diagram Main Switchboard...

Page 28: ...50 Hz Max Input Power 20 600 VA Max Input Current 30 0 AAC Rated Output Apparent Power VA 10 000 VA Max Output Power 10 000 VA Max Output Current 15 2 AAC Power Factor Range 0 8 lead 0 8 lag EPS Outp...

Page 29: ...C No of MPPTs 2 Short Circuit Current ISC 16A 32A 16 16 Max input current 12 5A 25A 12 5A 12 5A PV strings per MPPT 1 2 PROTECTION Overvoltage category III Main II PV Battery Anti islanding Frequency...

Page 30: ...ation Manual SunRise 3ph NS Install Version 1 0 Page 30 of 32 Issue Date 14 08 2022 Operating Temperature 25 C 60 C Pylontech BMU Specifications Pylontech Lithium Battery H48074 Specifications ISC kA...

Page 31: ...Manual SunRise 3ph NS Install Version 1 0 Page 31 of 32 Issue Date 14 08 2022 RedEarth Energy Storage Ltd 15 Fienta Place Darra Brisbane QLD 4076 Australia Tel 1800 733 637 Email support redearth ene...

Page 32: ...SunRise 3ph NS Installation Manual SunRise 3ph NS Install Version 1 0 Page 32 of 32 Issue Date 14 08 2022...

Reviews: