Installation – 8 steps for installation and customer handover
The SunRise system is designed to be easy to install. It includes prewired connection points and
comprehensive labelling and parts kit to simplify the installation.
Technical support is available directly from RedEarth during installation if required.
8 steps to complete the SunRise installation:
1.
Transporting – getting the SunRise to site
2.
Positioning – the SunRise in its final location on site
3.
Solar Install – including bringing the PV cabling to the SunRise system
4.
Electrical connections – at the SunRise system and the house switch board
4.1.
Solar
4.2.
Battery
4.3.
Grid & EPS
4.4.
Aux. Earth Fault Alarm
4.5.
MSB & Sungrow meter
5.
Understanding Turn on/Shutdown procedures
6.
Commissioning the system – turning on and programming and confirming system operation
7.
Activating remote Monitoring and Communications – contact RedEarth to confirm remote
operation
8.
Customer Handover – including helping with access to RedEarth EMU app
S
TEP
1.
T
RANSPORTING
The SunRise system is usually supplied on a pallet, with the batteries in separate cardboard
boxes. It has been factory tested; however, the batteries are usually subsequently removed for
transportation. Without batteries but with all other components in place the system weighs
126kg. Note that the inverter can be removed to further reduce the weight to 99kg if required.
The system weighs 414kg with x9 lithium batteries installed. and should be handled with proper
lifting equipment.
With two slots on the base, the Sunrise can easily be re-positioned with the help of a trolley jack