Red Valve Company SERIES 5400 Installation, Operation And Maintenance Manual Download Page 8

 

 SERIES 5400 FLANGE BOLTING SPECIFICATIONS

VALVE

NO. OF

BOLT CIRCLE

THREAD

A

B

BOLT TORQUE

SIZE

BOLTS

DIAMETER

SIZE

(ft. lbs)

1

"

4

3-1/8

"

1/2

"

 - 13 NC

1/2

"

3/4

"

20

1-1/2

"

4

3-7/8

"

1/2

"

 - 13 NC

1/2

"

5/8

"

25

2

"

4

4-3/4

"

5/8

"

 - 11 NC

1/2

"

3/4

"

40

2-1/2

"

4

5-1/2

"

5/8

"

 - 11 NC

1/2

"

3/4

"

50

3

"

4

6

"

5/8

"

 - 11 NC

1/2

"

3/4

"

55

4

"

8

7-1/2

"

5/8

"

 - 11 NC

3/8

"

7/8

"

40

5

"

8

8-1/2

"

3/4

"

 - 10 NC

3/8

"

"

50

6

"

8

9-1/2

"

3/4

"

 - 10 NC

5/8

"

7/8

"

60

8

"

8

11-3/4'

3/4

"

 - 10 NC

1

"

1

"

70

10

"

12

14-1/4

"

7/8

"

 - 9 NC

1/2

"

1

"

70

12

"

12

17

"

7/8

"

 - 9 NC

5/8

"

1-1/4

"

75

14

"

12

18-3/4

"

1

"

 - 8 NC

1

"

1-3/8

"

100

16

"

16

21-1/4

"

1

"

 - 8 NC

1

"

1-7/16

"

70

18

"

16

22-3/4

"

1-1/8

"

 - 7 NC

1-1/2

"

1-5/8

"

55

20

"

20

25

"

1-1/8

"

 - 7 NC

1-1/2

"

1-3/4

"

50

24

"

20

29-1/2

"

1-1/4

"

 - 7 NC

1-1/2

"

2

"

70

5200 IOM 5/97

Page 8 of 8

WARRANTIES - REMEDIES - DISCLAIMERS - LIMITATION OF LIABILITY
Unless otherwise agreed to in writing signed by Red Valve, all Products
supplied by Red Valve will be described in the specifications set forth on
the face hereof.

THE WARRANTIES SET FORTH IN THIS PROVISION ARE EXCLU-
SIVE AND IN LIEU OF ALL OTHER WARRANTIES WHETHER STATU-
TORY, EXPRESS OR IMPLIED (INCLUDING ALL WARRANTIES OF
MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE
AND ALL WARRANTIES ARISING FROM COURSE OF DEALING OR
USAGE OR TRADE).

Red Valve Products are guaranteed for a period of one year from date
of shipment, against defective workmanship and material only, when
properly installed, operated and serviced in accordance with Red
Valve's recommendations. Replacement for items of Red Valve's
manufacture will be made free of charge if proved to be defective within
such year; but not claim for transportation, labor or consequential
damages shall be allowed. We shall have the option of requiring the
return of the defective product to our factory, with transportation charges
prepaid, to establish the claim and our liability shall be limited to the
repair or replacement of the defective product, F.O.B. our factory. Red
Valve will not assume costs incurred to remove or install defective
products nor shall we incur backcharges or liquidated damages as a
result of warranty work. Red Valve does not guarantee resistance to
corrosion erosion, abrasion or other sources of failure, nor does Red
Valve guarantee a minimum length of service, or that the product shall
be fit for any particular service. Failure of purchaser to give prompt
written notice of any alleged defect under this guarantee forthwith upon
its discovery, or use, and possession thereof after an attempt has been
made and completed to remedy defects therein, or failure to return
product or part for replacement as herein provided, or failure to install
and operate said products and parts according to instructions furnished
by Red Valve, or failure to pay entire contract price when due, shall be
a waiver by purchaser of all rights under these representations.  All
orders accepted shall be deemed accepted subject to this warranty
which shall be exclusive of any other or previous warranty, and shall be
the only effective guarantee or warranty binding on Red Valve, anything
on the contrary contained in purchaser's order, or represented by any
agent or employee of Red Valve in writing or otherwise, not withstanding
implied warranties. RED VALVE MAKES NO WARRANTY THAT THE
PRODUCTS, AUXILIARIES AND PARTS ARE MERCHANTABLE OR
FIT FOR ANY PARTICULAR PURPOSE.

RED VALVE WARRANTY

RED VALVE WARRANTY

RED VALVE WARRANTY

RED VALVE WARRANTY

RED VALVE WARRANTY

A.

 

Standard pinch valves are

built to schedule 40 pipe I.D.
and to ANSI Class 125/150#
flange and bolt circle specifica-
tions. It is recommended that
the mating flanges are flat and
full faced.

B.

 It is recommended that the

mating flange be serrated to
"grip" the rubber flange. The
serrations should be cut 1/16"
deep, with a 90 angle tool
point. the pitch should be 8
(eight) cuts per inch.

C.

 Mating flange ID must match

the pinch valve
sleeve ID.

D.

 When installing a pinch

valve to a rubber, PVC, or any
"slick" mating flange, we
recommend that you install a
metal serrated gasket between
the two flanges to assist in
the seal.

E. 

When bolting a pinch valve

to a PVC or synthetic mating
flange, use a split back-up
retaining ring, since the mating
flange will yield prior to
generating enough force on the
flange faces for a proper seal.

F. 

Torque all the flange bolts in

a star pattern, first to 50% of
tabulated valves, then retorque
to 100% of tabulated valves. If
greater torque is required,
continue retorquing in incre-
ments of 50% of tabulated
valves. Use of high quality anti-
seize compound on all bolt
threads is recommended.

Variables such as the surface finish on bolt threads, type of
anti-seize compound used, and surface finish of the mating
flanges all have an effect on the minium torque required to
obtain a leak-tight flange seal.

A.

B.

C.

D.

E.

F.

1/16"

90

D1   = D2

1

2

3

4

5

6

7

8

Control Pinch
Valve Body

A   B

Rubber
Sleeve

Pipeline Flange
Weldneck is preferred so
that I.D. of flange matches
that of rubber sleeve

Summary of Contents for SERIES 5400

Page 1: ...400 Control Pinch Valve is a bi directional valve designed for tough slurry appli cations The elastomer sleeve closes on centerline creating a smooth venturi which reduces wear The flexing action of t...

Page 2: ...me Steel frame that provides the pivot points for the scissor mechanism and mounting point for the actuator 6 Side Rod Pins One pin for each side rod threaded on each end 7 Pivot Pins Two pins similar...

Page 3: ...longer represents the stroke length of the valve Returns All returns must have standard Red Valve Company return goods tags Sleeves to be inspected by the Red Valve Company must have the tag firmly at...

Page 4: ...ion site Only qualified personnel should handle the electrical connections Be sure to refer to the actuator manufacturer s IOM for proper safety precautions Reversing positive negative connections or...

Page 5: ...causing damage to the valve 4 MAINTENANCE Red Valve Company recommends lubricating the stem where it is attached to the bevel gear internals every 90 days The protective cover should be removed and t...

Page 6: ...ed for any reason it is important that it is re assembled in the correct order See Fig E 1 Place Mounting Frame 5 onto the top of the valve body If pattern of small holes in the bottom plate does not...

Page 7: ...Fig E 2 2 1 12 12 3 3 10 10 10 11 6 7 6 5 7 9 9 4 4 12 8 Page 7 of 8 See Page 2 of 8 for parts list...

Page 8: ...ith upon its discovery or use and possession thereof after an attempt has been made and completed to remedy defects therein or failure to return product or part for replacement as herein provided or f...

Reviews: