Installation Guide
4” AG Pump Service Kit
Manual No:
A042-078
●
Revision:
E
Part No. 344-001-5
Page 1: ...Installation Guide 4 AG Pump Service Kit Manual No A042 078 Revision E Part No 344 001 5...
Page 2: ...f any damages and or shortages within 30 days of receipt of the shipment as stated in our Terms and Conditions VEEDER ROOT S PREFERRED CARRIER 1 Fax Bill of Lading to V R Customer Service at 800 234 5...
Page 3: ...justing the Functional Element 9 To Adjust the Relief Pressure 9 Functional Element Parts List 11 Figures Figure 1 Electronic Line Leak Detector 4 Figure 2 Packer 4 Figure 3 Locating 7 Packer O Ring A...
Page 4: ...ask someone who does WEAR EYE PROTECTION Wear eye protection when working with pressurized fuel lines or epoxy sealant to avoid possible eye injury WARNING This product operates in the highly combust...
Page 5: ...Prevent Explosions and Fires Fuels and their vapors will explode or burn if ignited Spilled or leaking fuels cause vapors Even filling customer tanks will cause potentially dangerous vapors in the vic...
Page 6: ...A OSHA regulations and federal state and local fire codes and other applicable local regulations The selection of any Veeder Root product must be based upon physical specifications and limitations and...
Page 7: ...the pump close it 2 If an electronic line leak detection transducer is installed it must be removed from the leak detector port following instructions in the appropriate Line Leak installation manual...
Page 8: ...ld remove the old quad seal from the base of the packer under the line leak port see Figure 3 9 Clean the seating surface and the sealing surface of the quad seal 10 Lubricate the quad seal with petro...
Page 9: ...anifold Discharge Port 7 O Ring Packer Seal 7 O Ring Packer Seal Manifold Functional Element Functional Element Packer Packer Leak Detector Port Plug or Line Leak Detector Leak Detector Port Plug or L...
Page 10: ...lb 40 61 N m NOTE suggested tools non sparking include a 3 4 wrench pipe wrench 1 4 Allen wrench 9 16 wrench screw driver wire cutter and wire stripper 20 If applicable open ball valve down line from...
Page 11: ...gure 5 Functional Element 5 Carefully lift the functional element and remove it from the packer The old check valve and spring will be resting inside the packer NOTE The check valve and spring should...
Page 12: ...s fully down the relief pressure is approximately 30 psi 207 kPa Fully up will result in relief pressures between 0 3 psi 0 20 kPa 3 Lubricate the cap s o ring with petroleum jelly and replace cap by...
Page 13: ...with the dispenser furthest from the pump and work toward the pump 5 Pump start up is now complete Table 1 Approximate Pressures At Shut Off Pump Approximate Shut Off Pressure AGUMP33R1 UMP33R1 25 ps...
Page 14: ...Casting 2 017 526 1 Diaphragm 3 066 883 1 Poppet 4 072 641 1 O Ring 41 64 x 5 64 5 076 421 3 Adjustment Screw 6 012 956 3 Cap 7 080 767 1 Spring 8 066 620 1 Plug 9 060 332 1 Seal 10 012 965 3 Top Cast...
Page 15: ...For technical support sales or other assistance please visit www veeder com...