![Red Heating PERFORMA 25 EC Installation Manual Download Page 36](http://html1.mh-extra.com/html/red-heating/performa-25-ec/performa-25-ec_installation-manual_1427609036.webp)
h
P
c
b
34
5 - ELECTRICAL CONNECTION
GB
The other two ends “
h
” coming from the wiring (red wire) must be connected to the gear motor “
P
”. The image below shows the connection
to the gear motor “
P
”.
Take the other wiring with shorter wires and connect the end “
b
” to the mini board “
Z
” and the other “
c
” to the boiler board.