background image

2

Table of Contents

Terms and Condition ............................................................................. 3

1.1 

Precautionary Statements ...............................................................................3

1.2 Maintenance 

 ...................................................................................................4

1.3 Compliance ......................................................................................................4

1.4 

User Set-up ......................................................................................................4

Field Install ........................................................................................... 4

2.1 

Gather tools .....................................................................................................4

2.2 

Use Kit for Vertical Mounting ..........................................................................4

2.3 

Secure Data Gateway ......................................................................................5

2.4 

Attach bracket to Solar Panel..........................................................................5

2.5 

Select Installation Location ..............................................................................5

2.6 

Set Antennae Angle.........................................................................................5

2.7 

Tighten Zip Ties ...............................................................................................6

2.8 

Observe LED Indicators ..................................................................................6

2.9 

Power Data Gateway On .................................................................................6

Verification ............................................................................................ 6

3.1 

Verify Status Lights ..........................................................................................6

3.2 

Verify Cellular RSSI Lights................................................................................7

3.3 

Verify Cellular RSSI Lights (Continued) ...........................................................7

3.4 

Verify Timestamp .............................................................................................7

3.5 

Verify Signal Strength ......................................................................................7

4 Support ................................................................................................. 7

4.1 

Support Contact ..............................................................................................7

4.2 

Part Numbers ..................................................................................................7

Summary of Contents for 100-00526

Page 1: ...1 ...

Page 2: ...ta Gateway 5 2 4 Attach bracket to Solar Panel 5 2 5 Select Installation Location 5 2 6 Set Antennae Angle 5 2 7 Tighten Zip Ties 6 2 8 Observe LED Indicators 6 2 9 Power Data Gateway On 6 3 Verification 6 3 1 Verify Status Lights 6 3 2 Verify Cellular RSSI Lights 7 3 3 Verify Cellular RSSI Lights Continued 7 3 4 Verify Timestamp 7 3 5 Verify Signal Strength 7 4 Support 7 4 1 Support Contact 7 4 2...

Page 3: ...irst aid kit with you Use the pivot service disconnect to turn off the pivot and use a lock out tag out procedure before installation Read and follow your pivot manufacturer s safety instructions and guidelines when turning off the pivot CAUTION The area needs to be free of any obstacles or objects that may impact the installation All power to the pivot and towers must be disconnected before insta...

Page 4: ...e following two conditions 1 this device may not cause interference and 2 this device must accept any interference including interference that may cause undesired operation of the device Le présent materiel est conforme aux CNRexempts de licence d Industrie Canada Son fonctionnement est soumis aux deux conditions suivantes 1 cet appareil ne peut pas provoquer d interférences et 2 cet appareil doit...

Page 5: ...m the pivot While the Data Gateway is sealed direct spray increases the risk of water damage and mineral buildup on both the Data Gateway and the solar panel To prevent this issue install sprinkler drops Position the Data Gateway and solar panel on the pivot pipe within cable reach of each other Ensure the connec tor on Data Gateway faces solar panel Secure any excess cord from the solar panel usi...

Page 6: ... This will turn the Data Gateway on The status LED indicator will flash multi colored when first turns on see figure in step 3 9 The unit makes a popping sound and starts smok ing The latch chip was not put on the top side as shown Un plug the solar panel from the Data Gate way Contact customer support see step 4 The status LED flashes multi colored the Data Gate way is working The status LED indi...

Page 7: ...e are okay to excellent respec tively 3 3 Verify Cellular RSSI Lights Continued The Data Gateway will also initiate a cellular Verify the timestamp is showing the current connection and send a series of packets to verify functionality Solid green indi cates it is connecting to a cell tower 50 blinking green indicates it is communicating over cellular Immediately after booting the Data Gateway will...

Page 8: ...8 ...

Reviews: