STEP 3
Assembled View:
8/16
Secure the upper end of slant beam for
big foof (F) to the big top connector (G)
using push pin, then secure the lower end
to the post (A/B) using bolt (CC), washer
(DD) and nut (DD), tighten with wrench (Z1),
cover with cup (GG).