![Reach Technology PoE4N/10G Manual Download Page 12](http://html1.mh-extra.com/html/reach-technology/poe4n-10g/poe4n-10g_manual_1424858012.webp)
Reach PoE4N/10G Tester Manual 1.1
06/15/2020
Page 12
5.2.
Power input
Power Input (above); 2 instances, one for each power pair:
Each UUT port can have either power pair measured (reported voltage can be positive or
negative depending on polarity), or connected to the Full Wave Bridge and subsequent
load circuits.
Voltage measurement circuit
Full Wave Bridge input etc.
(see next section)
"measure" command
"connect" command