UNICA
Sanitary water heat pump
13
8.6
SCHEMATIC OVERVIEW OF THE WATER AND GAS CIRCUIT
8.7
SCHEMATIC OVERVIEW OF THE GAS CIRCUIT
9
INSTALLATION
WARNING: All the operations described below must be carried out only by QUALIFIED PERSONNEL. Prior to any
work on the unit, make sure that the power supply is disconnected.
9.1
GENERALITY
When installing or servicing the unit, it is necessary to strictly follow the rules listed in this manual, to conform to all the
specifications of the labels on the unit, and to take any possible precautions. Not observing the rules reported on this manual can
create dangerous situations.
After receiving the unit, immediately check its integrity. The unit left the factory in perfect condition; any eventual
damage has to be questioned to the carrier and recorded on the Delivery Note before signing it.
The company has to be informed, within 8 days, of the extent of the damage. The Customer should prepare a written statement of
any severe damage.
Please note that all the installation diagrams shown in this chapter are only a guide. The correct installation plant
must be evaluated case by case by the installer.