
8. Requirements for Ambient Conditions During Use
Normal ambient conditions for use of Resilient Power Control Module (RPCM) are the following:
●
operation range of ambient temperature is 0-40°С;
●
operation range of relative humidity is 45-85% (non-condensing);
●
operation range of altitude is 0-2000m.
The surrounding environment is non-explosive, does not contain a considerable amount of
conductive dust, vapors, aggressive gases in concentrations that harmfully affect RPCM components
and materials.
WARNING!
The maximum range of temperature fluctuation during storage is 20°C per hour.
Storage temperature is from -20 to 60°C. Prior to activating RPCM, it is necessary to allow the
device time of not less than 24 hours to adapt to the new conditions. Physical installation of RPCM
may continue during this acclimatization period. If there is condensation even after the 24-hour
period, it will be necessary to wait until the specified norms have been reached before you can
activate the system.
During inspection of the exterior, the following are to be determined:
●
there are no defects on and damages to the external surfaces of the product;
●
there is a seal and it is intact.
The quality of the modules’ plug assembly must ensure reliable contact with connecting elements
and eliminate inadvertent disconnection.
Electric connectors must ensure uninterrupted performance of technical support components and
external connectors must allow peripheral devices to be turned off and connected during regular
operation mode without loss in connection quality and ensure reliable electrical and mechanical
contact.
The surface area of RPCM and slots used must be free of chips, scratches, dents, and other defects.
9. Inspection before Installing and Using
http://rpcm.pro
Tel: +7 (495) 009 87 87, +7 (800) 302 87 87
E-mail: [email protected]
Contacts:
Feedback:
http://rcntec.com/feedback
Voltage < 240V. Frequency is 50-60Hz in a power grid.
Electric current level <16А for RPCM 1502, <32А for RPCM 1532 and <63A for RPCM ME 1563.
Voltage supply requirements:
●
for RPCM 1502 — two power cables with IEC-320-C19 connectors,
●
for RPCM 1532 — two sockets for plugging the 2P+E 32A 250V connectors,
●
for RPCM ME 1563 — one socket for plugging the 2P+E 63A 250V.
NOTE
: if only one cable is connected, the RPCM 1502 or RPCM 1532 will function properly except
for the ATS operation.
7. Power and Grounding Requirements