
7
ENGLISH
INSTALLATION
wARNING:
loudspeakers are to be installed by qualified personnel,
respecting all safety standards. Every loudspeaker must be installed securely,
making sure the support structure (walls / ceilings) has the necessary
mechanical characteristics for the loudspeaker weight, without the risk of a
fall that could damage things or cause an injury.
Use attachment elements suitable for walls / ceilings (e.g. screw anchors for
bricks, for concrete, etc.).
1. Connect the loudspeaker as described in the previous manual section.
2. Verify the proper loudspeaker aiming (bidirectional sound projectors have
both front and rear sides), indicated by the arrow and “front” on a label
close to the ceramic block.
All sound projectors installed in the same line shall have their front side
pointed to the same direction.
3. Use 2 plugs (not provided) to fix the loudspeaker through the 5.5 mm
holes on its mounting bracket. Plugs must be chosen carefully depending
on the type of wall (plasterboard, hollow bricks, solid bricks, concrete,
panels, etc.).
FRONT
FRONT
FRONT
FRONT
FRONT