2.1 Warm-up phase 

After  switch  on  the  warm-up  phase  starts.  It  lasts  between  60  seconds  and  four  minutes. 
Should the EPROM in the sensor head have no valid parameters the warm-up phase will always 
last four minutes.  
The maximum warm-up time will arise when the instrument has not been used for a long time. 
During warm-up time a running bar can be seen in the bar graph display which is a symbol for 
the progress of the warm-up phase.  
At the end of the warm-up phase a zero calibration will be done. Should the sensor resistance 
be out of the tolerance window a failure message will be indicated.   
During  warm-up  phase  the  actual  battery  voltage  can  be  displayed  via  the  „I/O“  button.  The 
display will return to the running bar after some seconds.  
An exchange of the sensor head should just be done when the instrument is switched off. It is 
done when the instrument is switched on a warm-up phase will be run automatically.   
During the first 10 seconds of the warm-up phase the voltage consumption of the LSG/LGK is 
higher than in normal operation.  

 

 

2.2 Measurement  

At the end of the warm-up phase a signal beep will sound and the actual sensor value will be 
taken as „Zero Concentration“ (zero setting). Out of this zero setting and the value of 1000 ppm 
calibration which is stored in the sensor head the senor characteristics for the measurement will 
result.  
 
In this mode following display mode can be selected via the “I/O” button: 

− 

Display  of  gas  concentration.  With  the  “Hold”  button  a  new  zero  point  can  be  taken 
(smallest button is blinking). The former zero point can be restored by long pressing of 
the “Hold” button. 

− 

Setting of the sensitivity (blinking bar). Selection via “Hold” button.  

− 

Battery display (Battery symbol is displayed ). Via the “Hold“ button the activation of the 
LCD lightning and the ppm beep is possible. 

 

Summary of Contents for ecom LSG

Page 1: ...von Carsten Pauli E Mail pauli rbr de Erstellungsdatum 22 02 2011 rbr Messtechnik GmbH Am Gro en Teich 2 D 58640 Iserlohn Tel 49 0 2371 945 5 Fax 49 0 2371 40305 Internet www rbr de E Mail info rbr de...

Page 2: ...phase 4 2 2 Measurement 4 2 3 Scale of the bar graph display 5 2 4 Sensitivity 5 2 5 Automatic Switch Off 5 2 6 Battery 5 2 7 Operation via the Jack Plug 6 3 Calibration 6 3 1 Change in the software f...

Page 3: ...O button the instrument is switched on and the display mode can be changed By long pressing of the I O button the LSG LSK will be switched off Press the button as long as the bars cannot be seen anym...

Page 4: ...the consumption increases to 180mW 20mW Attention The energy consumption is pulse shaped 1 7 Beep The beep will sound for function control during switch on The ppm beep can be switched off optionally...

Page 5: ...when the instrument is switched off It is done when the instrument is switched on a warm up phase will be run automatically During the first 10 seconds of the warm up phase the voltage consumption of...

Page 6: ...ng and factor 5 right bars are blinking At factor 5 ten bars will be shown already at a concentration of 200 ppm 2 5 Automatic Switch Off Should no button be pressed the instrument will switch off aft...

Page 7: ...zero calibration The detectable gas may not be in the ambient air The zero calibration will be done automatically after every warm up phase The resistance of the sensor must be in the range of 0 333 t...

Page 8: ...the humidity probe and both right connections are for the instruments which should be calibrated humidity probe connect gas bottle LSG with 1000ppm Methane in synth air LSK with R134A in synth air ad...

Page 9: ...son Failure reason Failure reason Failure reason Bar 14 wrong calibration when making the zero calibration a gas concentration was present to less difference between zero and 1000ppm calibration Senso...

Page 10: ...is switched Instrument Instrument Instrument Instrument Sensor Sensor Sensor Sensor app sensor resistance app sensor resistance app sensor resistance app sensor resistance in air in air in air in air...

Page 11: ...7 Testing Bottle A mixture is made of 40 parts water and one part Ethanol Ethanol 652 EG No 200 578 8 Of this mixture 8 ml will be filled in the cotton of the bottle The closing of the bottle has to...

Page 12: ...tly to the Cyclone Pro and contains all settings When programming t When programming t When programming t When programming the sensor head may not be populated he sensor head may not be populated he s...

Page 13: ...button menu than press the start button on the Cyclone Pro transfer starts 9 Exchange the Sensor unit The customer and all service department could exchange the sensor unit The sensor unit is pre cali...

Page 14: ...ion Even after the warm up phase is finished a new zero point is determined cyclical and the linearization is calculated new when having a positive sensor drift resistor bigger than to the end of the...

Reviews: