FUTERA III MODULATION
STARTUP SHEET
DATE:
JOB NAME:
TECHNICIAN:
LOCATION:
COMPANY:
MODEL #:
PHONE NUMBER:
SERIAL #:
PRE-STARTUP CHECK LIST
NO VISUAL DAMAGE TO UNIT
PIPING PROPERLY CONNECTED
BOILER CIRCULATOR WIRED
VENT/STACK CONNECTED
INLET AIR FILTER INSTALLED AND CLEAN
PROPER SERVICE CLEARANCE PROVIDED
PUMP RUNNING, HEAT EXCHANGER FULL
GAS LINES PURGED, NO LEAKS, NO MISSING
TEST PLUGS
BOILER STARTUP SEQUENCE
Note:
Locate the T1 and AA terminals in the bottom-right of the electrical panel on the control relay board. Also
locate the gas pressure tapping upstream of the main gas valve.
1. Create head demand, jumper the T1 terminals on the control board.
2. With gas off, check for continuous and strong spark.
3. With pilot gas on, check for proper pilot flame.
4. With main and pilot gas on, wait for boiler to reach 50%.
5. Check combustion using calibrated flue gas analyzer.
6. Record 50% fire combustion analysis below.
7. Jumper the AA terminals on the control board.
8. Record 100% fire combustion analysis below.
COMBUSTION ANALYSIS
50% FIRE
100% FIRE
GAS PRESSURE (IN. W.C.)
CO
2
O
2
CO (PPM)
NET STACK TEMP.
FIII-STARTUP REV 1.0
37