INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS
SYDNEY | MELBOURNE | BRISBANE | PERTH | AUCKLAND
Australia
1300 788 778 www.rba.com.au |
New Zealand
0800 722 111 www.rbagroup.co.nz
5 of 5
17. Follow Steps 1-9 to install
Steri+Shield
TM
seals and secure wall
plates to rail, repeating for all fixing
points.
18. Insert rail connector piece into
open-ended rail.
19. Position vertical rail. Refer to
technical datasheet for recommended
mounting locations to suit AS1428.1
20. Ensuring rail is level, slide up
flange cover and secure screws. Once
complete, slide flange cover into
place.
Installing RBA490X-711 & RBA490X-721