background image

Raytech USA, Inc.

All rights reserved.  No portion may be reproduced without written consent

9

OPERATION

After following the connection instructions previously listed, switch on the power to the TR-Spy
or Mark II and also on the T-Rex. (Power on sequence is not critical as the TR-Spy or Mark II
and the T-Rex communicate constantly). After a 2 second delay both systems should turn on.
The T-Rex should have all three phase lamps illuminated and the TR-Spy or Mark II should have
the display screen illuminated.

The first step in operation of the T-Rex is to ascertain the correct Vector phasing (Phase
displacement) of the transformer under test if unknown

(See also “

Test Result Notes

on the

next page). This can be accomplished by running a standard Ratio test on the transformer using
the TR-Spy or Mark II.

If the Phase displacement is known proceed to step 2.

1. Select the correct transformer configuration on the TR-

Spy or Mark II then select “?” if the

Vector phasing is unknown. Run a standard ratio test (refer to the TR-Spy or Mark II
manual). The TR-Spy or Mark II will display the correct vector phasing at the completion of
the test.

2.   Select the following screen on the TR-Spy or Mark II to initialize operation of the T-Rex:

T-Rex Operation screen

3.   Enter the Phase displacement number

or enter “0”.

Note 1: The Phase displacement (number 11 shown in the example) should be the same as

previously tested. The Phase displacement number can be changed if desired.

Note 2: By selecting the Phase displacement prior to testing, the actual phase result will be the

most accurate phase result obtainable. The displayed phase is then added or subtracted
from the vector setting. For example: Phase displacement of 1 is set and the instrument
shows 0.13º result. The actual phase displacement is 30.13º

4.

Press “GO” then “ALL” on the TR

-Spy or Mark II and the test sequence will check,

calibrate, and test each phase sequentially (A, B, C) while applying three phase voltage to the
transformer.

5. The Results of the voltage ratio and phase relationship will be displayed on the TR-Spy or

Mark II screen.

6.   End of Test. It is now possible to print or store the test results.

(see the TR-Spy or Mark II manual)

Summary of Contents for T-REX

Page 1: ...RAYTECH USA Inc 118 S 2nd Street Perkasie PA 18944 USA Tel 888 4 THE SPY Tel 267 404 2676 Fax 267 404 2685 THREE PHASE VOLTAGE OPTION Model T REX Instruction Manual Ver 2 3...

Page 2: ...HE SPY 484 3779 Tel 267 404 2676 Fax 267 404 2685 TABLE OF CONTENTS TABLE OF CONTENTS 2 SAFETY PRECAUTIONS 3 UNCRATING 4 INTRODUCTION 5 THEORY OF OPERATION 6 Circuitry Design 6 Design Consideration 6...

Page 3: ...nse the input power from the mains plus from 100 to 240 vac 50 60Hz Varying the input voltage will cause the test voltage to vary and result in a higher or lower test voltage than indicated GROUND THE...

Page 4: ...mmediately RAYTECH Toll free service support telephone 1 888 4 THE SPY 484 3779 Note 1 The T Rex Fieldcase is a waterproof design that incorporates a pressure relief valve that should be slightly open...

Page 5: ...h quick and accurate measurements The system is precision built and extremely accurate Ease of use The T Rex is an intelligent system option that communicates with the TR Spy or Mark II during three p...

Page 6: ...ounterclockwise direction With this indication the engineer is able to adjust the vector grouping Phase displacement number on the ratiometer to correspond to the closest relationship in 30 degree inc...

Page 7: ...easurement Parameters PHASE ANGLE 180 Degrees ACCURACY 0 1 Degree RESOLUTION 0 1 Degree Temperature Operating 10 C to 60 C Storage 40 C to 70 C Cable Set 3 Phase cable extension set Interconnect Power...

Page 8: ...e T Rex marked TO TURNS RATIO SPY to the H X connectors on the TR Spy or Mark II 2 Connect the 25 pin Interface cable from the connector located on the middle right side of the T Rex marked TO TR SPY...

Page 9: ...d ratio test refer to the TR Spy or Mark II manual The TR Spy or Mark II will display the correct vector phasing at the completion of the test 2 Select the following screen on the TR Spy or Mark II to...

Page 10: ...t and test Afterwards check the results against the nameplate 2 Greater accuracy of the actual phase displacement can be achieved by selecting a vector grouping as close to the actual phase displaceme...

Page 11: ...nce of credit for such parts and or materials shall be the sole responsibility of purchaser This warranty shall not apply to any accessories parts or materials not manufactured or supplied by RAYTECH...

Reviews: