940-M-0003
Page 2
Revision B
1. SAFETY INSTRUCTIONS
1.
Read this leaflet carefully before commencing to install the SPARTAN Bulkhead unit
and retain it for future use. Installation can only be carried out by suitably qualified
personnel.
2.
Check the certification to ensure that the mains supply, ambient temperature present and
‘T’ rating are suitable for the environment the unit is being installed in.
3.
If the SPARTAN unit is to be installed in areas of high vibration, please consult with
Raytec.
4.
The SPARTAN unit housing is constructed from marine grade aluminium and toughened
glass. The end user must ensure that these materials are suitable for the environment
the SPARTAN unit will be installed in; Zone 1 and Zone 2 Hazardous areas.
5.
Check certification nameplate on side of floodlight to ascertain type of threaded cable
entry on the luminaire. Select suitably certified ATEX/IEC Ex cable glands and stopper
plugs, these must be parallel thread, have a minimum of 5 full thread engagement and
be of a medium/fine tolerance to ISO965-1 and ISO965-3. The cable entry devices
selected must maintain the IP rating of the luminaire
6.
The incoming mains cable should not exceed a temperature rise of 20
o
C above the
ambient conditions; select suitable cable.