Raypak HI DELTA HD101 THRU 2342B User Manual Download Page 4

Project Name / Date 

 

Division 23 52 33.13 - 4

 

PART 3 - EXECUTION  

3.1 INSTALLATION 

A.  Must comply with:  

1.  Local, state, provincial, and national codes, laws, regulations and ordinances 
2.  National Fuel Gas Code, ANSI Z223.1/NFPA 54 – latest edition 
3.  National Electrical Code, ANSI/NFPA 70 – latest edition 
4.  Canada only: CAN/CSA B149 Installation Code and CSA C22.1 CEC Part I 
5.  Manufacturer’s installation instructions, including required service clearances and venting 

guidelines 

B.  Manufacturer’s representative to verify proper and complete installation. 

3.2 START-UP 

A.  Shall be performed by Raypak factory-trained personnel. 
B.  Test during operation and adjust if necessary: 

1. Safeties 
2. Operating 

Controls 

3.  Static and full load gas supply pressures 
4.  Gas manifold and blower air pressures 

C.  Submit copy of start-up report to Architect and Engineer. 

3.3 TRAINING 

A. Provide 

factory-authorized 

service representative to train maintenance personnel on procedures 

and schedules related to start-up, shut-down, trouble shooting, servicing, and preventive 
maintenance. 

B.  Schedule training at least seven days in advance. 

END OF SECTION 

 

Reviews: