Division 23 52 33.13 - 5

 

B.  Manufacturer’s representative to verify proper and complete installation. 

3.2 START-UP 

A.  Shall be performed by Raypak factory-trained personnel. 

B.  Test during operation and adjust if necessary: 

1.  Safeties (2.2 - F) 
2. Operating 

Controls 

(2.3) 

3.  Static and full load gas supply pressure 
4.  Gas manifold and blower air pressure 

C.  Submit copy of start-up report to Architect and Engineer. 

3.3 TRAINING 

A. Provide 

factory-authorized 

service representative to train maintenance personnel on procedures 

and schedules related to start-up, shut-down, trouble shooting, servicing, and preventive 
maintenance. 

B.  Schedule training at least seven days in advance. 

END OF SECTION 