![background image](http://html1.mh-extra.com/html/raypak/500/500_operating-and-installation-manual_3943791008.webp)
8
CLEARANCES
TABLE 1
MINIMUM CLEARANCES FROM COMBUSTIBLE SURFACES
(INDOOR ALCOVE INSTALLATIONS)
Boiler Size
Boiler Side
500
750
1000
Floor
See Note 1.
Rear
1”
1"
1"
Right
12” (Water side)
12" (Water side)
12" (Water side)
Left
1”
1”
1”
Top
0”
0”
0”
Vent
1”
1”
1”
Note 1. Do not install on carpeting.
Figure B-1
MINIMUM CLEARANCES FROM COMBUSTIBLE SURFACES AND FOR EASY SERVICING
Summary of Contents for 500
Page 6: ...6 FigureA 1 ADVANCED DESIGN BOILER COMPONENT LOCATIONS...
Page 21: ...Figure G 3a DOUBLE BOILER POOL APPLICATION 21...
Page 53: ...53 Figure L 2 WIRINGDIAGRAM...
Page 58: ...58 Figure O 1 COMPONENTAND PRESSURE TAPLOCATIONS Blower T fitting detail...
Page 68: ...68...
Page 69: ...69...
Page 70: ...70...
Page 71: ...71...
Page 72: ...72...