background image

5

Connecting Power to the
Controller

Supply power from the 120 VAC power input from the
heater to the controller power inputs Terminal Block
(TB1). This is accomplished by connecting wiring from
the control box to the heater TB1 board 120 VAC
power input connections. Refer to wiring diagrams.

Fig. 3: Component Locations — Hi Delta

Fig. 4: Location of TB1 in Control Box

NOTE:

If a “DIP” switch is provided on the control

PCB, verify that the switch settings are correct: 1 =
OFF, 2 = ON, 3 = OFF.

OPERATION

Verify the following upon a CALL FOR HEAT signal
from the heater:

1. CALL FOR HEAT LED on PCB illuminates GREEN.

2. START UP MODE LED on PCB illuminates YEL-

LOW. Before 7 minutes it should go out if boiler
inlet  temperature is approaching the set point tem-
perature.

3. The “ACTUATOR” should be in the fully open posi-

tion or move to the fully open position if not already
there. (Actuator at the fully CCW position)

4. Before 7 minutes time has elapsed if the control is

operating properly the “START UP MODE” LED
should go out. The inlet water temperature should
be stable at a temperature between 105° F and
120° F (Normally set to 110° F) cooresponding to
the Set Point Pot setting on the PCB. The actuator
should have stopped moving.

CALL FOR HEAT 
START UP MODE 
INLET TEMP ERROR 
SENSOR OUT OF RANGE 

Set 
Point 
Pot

Fig. 5: Control PCB

Models

X

302B-902B

7.0

992B-2342B

13.20

LEFT SIDE

Reset Switch

Summary of Contents for 1000.57A

Page 1: ...nd kept adjacent to the heater or in another safe place for future reference Catalog No 1000 57A Effective 02 28 07 Replaces 02 24 06 P N 241275 Rev 2 INSTALLATION AND OPERATING INSTRUCTIONS COLD WATE...

Page 2: ...2...

Page 3: ...tream and read the thermometer 3 NOTE When this water heater is supplying general purpose hot water for use by individuals a thermo statically controlled mixing valve for reducing point of use water t...

Page 4: ...e sensor A tem plate is supplied for field installed kits to locate the control box properly Attaching the Temperature Sensor Avoid routing wiring on or near other electrical wires conduit motors spar...

Page 5: ...minates GREEN 2 START UP MODE LED on PCB illuminates YEL LOW Before 7 minutes it should go out if boiler inlet temperature is approaching the set point tem perature 3 The ACTUATOR should be in the ful...

Page 6: ...erminal 2 of terminal block 3 to the NO contacts of the DPST relay located in the cold start control panel 14 After the two second delay on the cold start circuit board pin MC outputs a 24 VAC signal...

Page 7: ...ater IF VALVE DOES NOT MOVE Check for voltage out at TB2 1 Should be a 1VDC to 10VDC output to the actuator valve If no voltage is present check for volt age at TB2 3 there should be a 12VDC signal If...

Page 8: ...8 Cold Water Start Troubleshooting Guide...

Page 9: ...9 Wiring Diagram...

Page 10: ...ode ANSI NFPA 70 For Canada only CAN CGA B149 1 installation Code B149 1 and CSA C22 1 C E C Part 1 and Part 2 Mounting the Control Box The control box should be mounted on the side of the heater to w...

Page 11: ...1532 120 22 12 4 62 42 1911 1 3hp 1632 5 6 1802 120 25 13 68 45 1911 1 3hp 1632 5 6 2002 132 26 19 74 46 1935 3 4hp 1634 6 1 2072 132 27 19 75 47 1935 3 4hp 1634 6 1 2342 132 30 21 4 80 50 1935 3 4hp...

Page 12: ...the system 4 Allow heater to cool down before attempting work In order to install the pump cover you will need to rotate the pump body so that the electrical box is point ing downward as outlined in t...

Page 13: ...olts secur ing the pump body in place 4 You will now be able to install the pump cover See Fig 18 and 19 Fig 15 Reposition the pump body so that the electrical box points downward Fig 16 Place the cov...

Page 14: ...14 Typical Boiler Piping Hi Delta shown...

Page 15: ...signal to terminal AL0 of the Hitachi inverter 9 The AL0 relay closes and outputs a 24 VAC signal to the coil of the DPST relay located in the cold run control panel 10 The DPST relay coil energizes a...

Page 16: ...16 Wiring Diagram...

Page 17: ...ornia 1 800 627 2975 Inside California NO Verify 120VAC from TB1 on the heater and correct YES Does TB1 of cold run controller have 120 VAC Heater is in standby mode Correct Wiring YES NO NO YES YES N...

Page 18: ...18 ILLUSTRATED PARTS LISTS Cold Water Start...

Page 19: ...A 007353F PUMP WATER BR 2 1 2 FLANGE 3 4 HP 007348F 007348F PUMP WATER CI 2 1 2 FLANGE 3 4 HP 007354F 007354F PUMP WATER BR 2 1 2 FLANGE 1 HP 007348F 007348F PUMP WATER CI 2 1 2 FLANGE 1 HP 007354F 00...

Page 20: ...20 Cold Water Run...

Page 21: ...2 7 0 0 P H 4 1 E G N A L F 2 I C R E T A W P M U P PUMP WATER BR 2 1 2 FLANGE 3 4 HP 007348F 007348F PUMP WATER CI 2 1 2 FLANGE 3 4 HP 007354F 007354F F 1 5 3 7 0 0 F 1 5 3 7 0 0 P H 1 E G N A L F 2...

Page 22: ...raypak com Raypak Inc 2151 Eastman Avenue Oxnard CA 93030 805 278 5300 Fax 805 278 5468 Raypak Canada Limited 2805 Slough St Mississauga Ontario Canada L4T 1G2 905 677 7999 Fax 905 677 8036 Litho in U...

Reviews: