5
SECTION 2
INSTALLATION
2.1 UNPACKING AND INSPECTION
Use care when unpacking your new RAY210 from the shipping carton to
prevent damage to the contents. It is also a good practice to save the carton and
the interior packing material. The original packing material should be used in the
unlikely event that it becomes necessary in the future to return the unit for
service.
2.2 EQUIPMENT SUPPLIED
The following is a list of the standard equipment include with your RAY210
model.
Description
Part No.
Radiotelephone
M56798
Microphone Bracket w/hardware
G623759-3
Mounting Yoke
G623760-7
Yoke Knob
G623760-8
Yoke Rubber Spacer
G623760-9
Microphone
G623759-2
Power Cable
G623760-6
Instruction manual
G623759-5
Bridge Card
G623759-6
Fuse (s) Kit
FCC Instructions
FCC FORM506
Sun Cover
G623759–4
Summary of Contents for Ray 210
Page 2: ......
Page 3: ......
Page 4: ......
Page 6: ......
Page 8: ......
Page 10: ......
Page 12: ......
Page 19: ...7 Figure 2 2 Outline and Mounting Dimensions...
Page 30: ...18 Figure 3 1 Layout of Controls and Connectors...
Page 40: ...28 Fig 4 1 Block Diagram RF PCB...
Page 41: ...29 Fig 4 2 Block Diagram CPU PCB...
Page 55: ...43 6 2 RAY210 ASSEMBLY DRAWING...
Page 57: ...45 6 3 SCHEMATIC DIAGRAM Fig 6 1 Schematic diagram RF PCB...
Page 58: ...46 Fig 6 2 Schematic diagram CPU PCB l...
Page 59: ...47 Fig 6 2 Schematic diagram CPU PCB 2...
Page 60: ...48 Fig 6 3 RF PCB Layout Top View...
Page 61: ...49 Fig 6 4 RF PCB Layout Rear View...
Page 62: ...50 Fig 6 5 CPU PCB Layout Top view...
Page 63: ...51 Fig 6 5 CPU PCB Layout Rear View...
Page 64: ...52...
Page 75: ...63...