![Rayleigh Instruments RI-ENERGYFLOW 3P Series User Manual Download Page 18](http://html1.mh-extra.com/html/rayleigh-instruments/ri-energyflow-3p-series/ri-energyflow-3p-series_user-manual_3937047018.webp)
3.6 Starting the Inverter
4. User Interface
4.1 Led and key
4.2 LCD display
4.3 Factory setting
Figure 4-1 LED display
Description
Run
Fault
Pushbutton
Object
1
1
2
No.
Normal/Fault
Pac =
W
Vpv1
:
V
Pac =
W
Ipv1
X
A
Pac =
W
Va
X
V
Pac =
W
Ia
X
A
Pac =
W
Freq
X
Hz
Pac =
W
Event list
Pac =
W
Setting
Pac
X
W
Serial Number.
Model
Firmware
M: ×.×× S:×.××
SafetyCountry
××××××
E-today:
Kwh
Pac =
W
E-total:
Kwh
Pac =
W
Fault Code1
Pac =
W
Set Language
Pac =
W
Set Country
Pac =
W
...
Pac =
W
...
Pac =
W
Use
rs
etting
Factor
ys
etting
Set Language
Factory Set
Set Country
Factory Set
Mac Addr
xx
Set PF
Pac =
W
Clear Events
Pac =
W
Factory Settings
Pac =
W
Clear E-total
Pac =
W
PF
X
xxx
Pac =
W
Set MacAddr
Pac =
W
English
Factory Set
Portuguese
Factory Set
VDE4105
Factory Set
EN50549
Factory Set
...
Factory Set
Fault Code ...
Pac =
W
...
Pac =
W
...
Pac =
W
Factory Set
Pac =
W
xx
Pac =
W
Export Power
Pac =
W
...
Pac =
W
Vac Protect
Pac =
W
Fac Protect
Pac =
W
Set Input Mode
Pac =
W
Auto-test Italy
Pac =
W
...
Pac =
W
...
Pac =
W
...
Pac =
W
...
Pac =
W
Vpv2
X
V
Pac =
W
Ipv2
X
A
Pac =
W
Vb
X
V
Pac =
W
Vc
X
V
Pac =
W
Ib
X
A
Pac =
W
Ic
X
A
Pac =
W
Before turning on the inverter, please confirm the following:-
1 ) The three-phase (five wires - PE/L1/L2/L3/N) cable is correctly connected to the inverter AC side through an AC
circuit breaker;
2) The DC cable is correctly connected to the inverter DC side through a DC circuit breaker. Ensure the correct
connection of the two strings and their polarity.
3) Any unused terminals are covered.
1 ) Close the DC and AC circuit breakers;
2) If the solar panels are providing enough energy, the power module will function and the LCD panel will be lit;
3) If you are starting the inverter for the first time, the inverter needs to be commissioned. The process of
commissioning is described on page 17, chapter 4.3.
4) The inverter will then enter self-check mode and the LCD panel will simultaneously display the remaining time
of connection.
5) The inverter should then enter normal operations mode and will feed electrical energy into the grid, and the LCD
panel will display the generated electrical energy.
16
Summary of Contents for RI-ENERGYFLOW 3P Series
Page 2: ......
Page 26: ...3 3 3 3 3 3 3 3 2 2 2 2 4 4 4 3 24...
Page 27: ...Telephone 44 0 1245 428500 Email sales rayleigh com 25...