Outer jacket
Braid
Bus wires
Conductive core
Inner jacket
FTC-XC Installation Instructions
7 in
6 3/4 in
1
2
• Lightly score completely around and then down outer jacket.
• Bend heating cable to break jacket at score; peel off outer jacket.
XL-Trace -CR and -CT
RaySol heating cable
6 in
1/4 in
3
5
4
6
• Shrink tubing by moving
heat source continuously
from side to side.
• Slide 5
1
⁄
2
in black shrink tubes into
place against conductive core.
Power Connection Installation for
XL-Trace -CR and -CT, and RaySol Heating Cables
Heating Cable Construction
• Gently spread apart braids as shown.
• Bend heating cable and work it through the opening in the braid.
• Position the braid on one side of the heating cable.
• Straighten the braid and twist into a "pigtail".
• Lightly score completely down and around the inner jacket.
• Bend heating cable to break jacket and score; peel off inner jacket.
• Notch core at end.
• Peel bus wires
from core.
• Score between bus
wires at base jacket.
• Bend core to break
free at base jacket.
Peel core and any remaining
•
material from bus wires.
Do not cut through
braid or inner jacket.
2
CAUTION
:
Health Hazard.
Consult material safety data
sheet RAY3122.