
SERVICE SCHEDULE
*IMPORTANT: ISOLATE ALL THE ELECTRICAL SUPPLIES TO THE APPLIANCE.
2.1. Twice a Year.
(a) Service clean of boiler heat exchanger flueways and oven and hotplate flueways together with firebricks -
section 3.2
(b) Change four loose fire bricks from winter to summer arrangement or vice versa -
section 3.3
(c) Removal of oil burner for cleaning and inspection -
section 3.4
(d) Burner Servicing -
section 3.5
2.2 Annually.
As above plus cleaning of oil pump strainer and fuel line strainer -
section 3.5.2
.
2.3 Post Service Checks -
section 6
.
Remember, when replacing a part on this appliance, use only spare parts that you can be assured conform to the
safety and performance specification that we require. Do not use reconditioned or copy parts that have not been
clearly authorised by AGA-RAYBURN.
INSTALLATION INSTRUCTIONS
3.1 Preparation.
Ensure that the cooker is cold by turning ‘OFF’ oven and boiler thermostats the evening before the service visit.
Before removing service access covers or the oil burner ensure that ALL electrical supplies to the appliance have
been turned OFF (switch off and remove plug).
The burner can be removed without disconnecting the oil supply pipe. However if the filters are being cleaned or a
pressure gauge fitted to the pump then the oil supply should be turned OFF and arrangements made to catch any
oil which will leak from the oil pump.
3.2 Flueway and Combustion Chamber Cleaning
Lift out the hotplate with the handles provided (
see fig. 1
). Use the rake and brush to remove debris from the
flueway above the oven and vacuum this area and the top of the firebrick baffles which are fitted above the burner
chamber (
see fig 2
).
Carefully remove the two baffle bricks by separating them and lifting at the front (
see fig 3
).
Either remove the burner (
section 3.4
) or protect the burner tube to prevent debris from falling into it.
Remove the enamelled cover behind the LH insulating cover (
see fig. 4
) and remove the sealing plate (twist clips
on LHS). Remove the boiler flue baffle to expose the boiler outlet flueway which should be scraped and brushed
clean. Remove all debris which will have fallen into the combustion chamber.
REASSEMBLY NOTE:
Reassemble boiler flue baffle ensuring that narrow end of baffle marked ‘left’ is on the left
end of flueway and the location brackets are dropped into end sections of flueways. Refit sealing plate and the
enamelled cover in reverse order of removal.
Page 2 of 26
26/10/2006
file://\\server1\docs\NetCDs\Aga%20Product%20Information%20Spares%20and%20Tec...