
48
Fig.45
Fig.44
8.9
TO REMOVE/REPLACE EXPANSION
VESSEL (Fig.44)
Remove front and bottom panels
(fig. 39-40).
Drain the CH circuit, unscrew the fixing
bracket and the nut connecting the
expansion vessel. Lift up the vessel
and remove.
Replace in reverse order. Use a new
gasket, taking care to ensure they are
replaced correctly.
8.10
TO REMOVE/REPLACE GAS VALVE
(Fig. 45)
Remove front and bottom panels
(fig. 39-40).
Unscrew the nut and the four screws on
Unscrew the nut and the four screws on
the bottom of the gas valve.
the bottom of the gas valve.
Replace in reverse order.
Replace in reverse order.
IMPORTANT:
when the gas valve is re-fitted,
check
combustion CO2 and adjust if
necessary (see section 6.9).
8.11
TO REMOVE/REPLACE PLATE HEAT
EXCHANGER (Fig. 46)
Remove front and bottom panels
(fig. 39-40).
Remove the panel control box (sect.
8.23).
Close off the on/off valves for CH circuit
and DHW circuit and drain the boiler and
drain hot water from the lowest hot water
tap.
Unscrew the two al
Unscrew the two allen screws that
connect the DHW heat exchanger and
pull it out from the boiler (fig. 46).
If necessary the pipes from the flow
manifold may have to be removed for
easier access. Lift up the plate heat
exchanger.
Replace in reverse order.
NOTE: Always use new O-rings.
8.12 TO REMOVE/REPLACE THE WATER
PRESSURE TRANSDUCER (Fig. 45)
Remove front and bottom panels
(fig. 39-40).
Close the on/off valves for the heating
circuit and drain the water at drain point
(fig.36).
Detach the wire connector, remove the
securing clip.
Replace in reverse order.
Fig.46
Summary of Contents for White Boiler WH 80
Page 2: ...2 ...
Page 21: ...21 4 10 FLUE TERMINAL POSITION ...
Page 54: ...10 ELECTRICAL SYSTEM DIAGRAM 54 Fig 61 ...
Page 55: ...55 11 SPARE PARTS Fig 62 ...
Page 59: ......
Page 62: ...61 ...
Page 63: ...62 ...
Page 65: ...64 FLOWCHART FOR CO LEVEL AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER ...
Page 66: ...65 12 1 ANALYSER CHECK LIST ...