background image

 
 

 

 

  

CONTENTS | CR7 | QUICKSTART STEERING MANUAL 

PAGE 5/34 | User manual | 016-8000-017EN | Rev. B 

CONTENTS 

PREFACE ..............................................................................................................................................................................................................3

 

DISCLAIMER .......................................................................................................................................................................................................4

 

CONTENTS .........................................................................................................................................................................................................5

 

1

 

SETUP WORKING WIDTH ......................................................................................................................................................................6

 

 

CREATE NEW (MOUNTED) EQUIPMENT ................................................................................................................................6

 

 

CHOOSE (MOUNTED) EQUIPMENT FOR THE JOB .......................................................................................................... 10

 

2

 

CREATE GROWER, FARM, FIELD STRUCTURE............................................................................................................................. 13

 

3

 

START FIELD AND JOB ........................................................................................................................................................................ 14

 

 

QUICK START NEW FIELD AND NEW JOB .......................................................................................................................... 14

 

 

LOAD FIELD AND CREATE NEW JOB IN THE FIELD ......................................................................................................... 15

 

4

 

CREATE AND SHIFT-NUDGE AB LINE ............................................................................................................................................ 16

 

 

CREATE AB-LINE ........................................................................................................................................................................... 16

 

 

SHIFT – NUDGE AB LINE ............................................................................................................................................................ 19

 

5

 

DRIVING DIRECTION ........................................................................................................................................................................... 21

 

7

 

CREATE AND LOAD A BOUNDARY (SCOUT FEATURE) .......................................................................................................... 22

 

8

 

IN-JOB SCREEN SETUP ........................................................................................................................................................................ 24

 

9

 

DAY / NIGHT MODE ............................................................................................................................................................................. 27

 

10

 

MASTER SWITCH COVERAGE CONFIGURATION ...................................................................................................................... 28

 

11

 

IMPORT FIELDS, LINES AND/OR JOBS .......................................................................................................................................... 29

 

12

 

EXPORT FIELDS, LINES AND/OR JOBS .......................................................................................................................................... 32

 

Summary of Contents for CR7

Page 1: ...User manual English Original CR7 QUICKSTART STEERING MANUAL 016 8000 017EN REV B...

Page 2: ...PAGE 2 34 User manual 016 8000 017EN Rev B Raven Industries Inc...

Page 3: ...or omissions in this document Any comments or questions can be sent to service eu ravenind com Raven Europe or any of its suppliers will accept no liability for physical or material damage caused whil...

Page 4: ...ist and who are both physically and mentally fit and able to operate the system The system contains moving parts Make sure the immediate environment is clear of people before operating the system In c...

Page 5: ...RM FIELD STRUCTURE 13 3 START FIELD AND JOB 14 QUICK START NEW FIELD AND NEW JOB 14 LOAD FIELD AND CREATE NEW JOB IN THE FIELD 15 4 CREATE AND SHIFT NUDGE AB LINE 16 CREATE AB LINE 16 SHIFT NUDGE AB L...

Page 6: ...WIDTH CREATE NEW MOUNTED EQUIPMENT Description Figure 01 Go to the settings and press Machine This will open the Machine Garage 02 In case of a mounted implement press on the already configured tract...

Page 7: ...nged Press in the boxt next to Total Width to enter the machine width The machine width is the complete width of the implement of sections is standard on 1 08 If the Guidance width needs to be differe...

Page 8: ...tal Width generated automatically Press next step 10 Enter the value from the rear axle to the reference point of the implement for example where the seed hits the ground Press next step 11 If the imp...

Page 9: ...13 In this example is a Fertilizer which has 7 sections Total width is the same as Guidance width so there is no overlap Enter the of sections Press next step 14 The sections are automatically configu...

Page 10: ...the machine garage 16 Select the tractor 17 Delete all the created implements in the Mounted Equipment list When deleting the implements are just removed from the tractor They are back in the shed an...

Page 11: ...WIDTH CR7 QUICKSTART STEERING MANUAL 19 When the list is empty press Mount Equipment 20 Select only the implement that is mounted 21 Press the green checkmark 22 Now the list with Mounted Equipment co...

Page 12: ...KSTART STEERING MANUAL PAGE 12 34 User manual 016 8000 017EN Rev B Raven Industries Inc 23 Check if the Guidance Width corresponds to the Guidance width expected Press the green checkmark 24 The corre...

Page 13: ...CREATE GROWER FARM FIELD STRUCTURE CR7 QUICKSTART STEERING MANUAL 2 CREATE GROWER FARM FIELD STRUCTURE Description Figure 25 Press on GFF in the settings menu 26 Create new rename or delete Grower Far...

Page 14: ...heckmark 28 Press the blue arrow on the bottom of the screen 29 Select the Grower and Farm as created in the GFF settings step 26 and enter a Field Name Job Name is standard the date and time of creat...

Page 15: ...ss the blue arrow on the side of the screen in Maps Select the Field 32 Press New Job if a New Job is started Select one of the existing Job s underneath to open and restart an existing Job 33 The nam...

Page 16: ...NUDGE AB LINE CREATE AB LINE Description Figure 35 Press on the button with the arrow on the right side of the screen 36 Press on the type of line that needs to be created for this example we use the...

Page 17: ...is big enough after 10m the line will be created and Autosteer can be activated It is more accurate to enter Set B on the other side of the field Press Set B 40 Press the green checkmark 41 Press on...

Page 18: ...TART STEERING MANUAL PAGE 18 34 User manual 016 8000 017EN Rev B Raven Industries Inc 43 Enter a name and press the green checkmark 44 Press the green checkmark 45 Close the Guidance Line widget by pr...

Page 19: ...not in the screen proceed to step 59 and add the widget before continuing 47 After pressing the arrows on the right and left side appears next to the widget Press and hold the widget min 3 sec to conf...

Page 20: ...the arrow to nudge the line with the preset distances per arrow 51 Press the Center Line widget to shift the closest Guidance Line underneath the machine The closest line is now on the current positio...

Page 21: ...scription Figure 52 When driving forward the the arrow must be shown as in the next screen just a blue arrow without a red arrow in front of it 53 When the big red arrow is in front of the blue arrow...

Page 22: ...the right side of the screen 55 To load an existing boundary press on the existing feature when they are created they are saved and can be loaded in the white list underneath To create a boundary pres...

Page 23: ...er manual 016 8000 017EN Rev B CREATE AND LOAD A BOUNDARY SCOUT FEATURE CR7 QUICKSTART STEERING MANUAL 58 When the boundary is finished press on the stop button and save the boundary Give the boundary...

Page 24: ...7 IN JOB SCREEN SETUP Description Figure 59 Press on the button with the gear in it on the right side of the screen 60 Select the widget which needs to be added to the Job layout 61 Press the widget o...

Page 25: ...utton with the arrows to change the position of the widget 64 Press on the button with the trash can to delete the widget from the screen 65 Press on the button with the open arrow if available to go...

Page 26: ...IN JOB SCREEN SETUP CR7 QUICKSTART STEERING MANUAL PAGE 26 34 User manual 016 8000 017EN Rev B Raven Industries Inc 67 Press on the widget again to remove the bar with options and see just the widget...

Page 27: ...000 017EN Rev B DAY NIGHT MODE CR7 QUICKSTART STEERING MANUAL 8 DAY NIGHT MODE Description Figure 68 Add the widget day night switch see chapter 6 how to add the widget 69 Press on the widget to chang...

Page 28: ...coverage 1 Require all on All selected inputs needs to be on before coverage starts 2 Steering When steering is activated coverage is starting 3 On Screen Add an in job widget with a master switch to...

Page 29: ...FIELDS LINES AND OR JOBS Description Figure 73 Insert USB or use a Slingshot Field Hub for over the air File Transfer 74 Go to the settings page and press on File Manager 75 Press on Local to choose...

Page 30: ...ies Inc 77 For this example we use USB 78 The fields are shown on the screen This must be files of the format SHP KML 79 Select the fields that must be imported Press on the button with the Copy icon...

Page 31: ...PAGE 31 34 User manual 016 8000 017EN Rev B IMPORT FIELDS LINES AND OR JOBS CR7 QUICKSTART STEERING MANUAL 81 The files are now imported on the CR7...

Page 32: ...Field Hub for over the air File Transfer 83 Go to the settings page and press on File Manager 84 The source must be on Local the standard setting 85 Select the file that needs to be exported On the l...

Page 33: ...8000 017EN Rev B EXPORT FIELDS LINES AND OR JOBS CR7 QUICKSTART STEERING MANUAL 86 Select if the file needs to be exported to Slingshot if mounted or USB Press the green checkmark to start the export...

Page 34: ...Hoornseweg 22 1775 RB Middenmeer The Netherlands Phone 31 227 54 93 00 Web www raveneurope com Email service eu ravenind com...

Reviews: