background image

AIM Command FLEX, Patriot 

MY 2017 Installation Manual

 P/N 016-0171-633 Rev. B      02/17                 E29154

Copyright 2017

Summary of Contents for AIM Command FLEX

Page 1: ...AIM Command FLEX Patriot MY 2017 Installation Manual P N 016 0171 633 Rev B 02 17 E29154 Copyright 2017 ...

Page 2: ...nsible for any modifications or repairs made outside our facilities nor damages resulting from inadequate maintenance of this system As with all wireless and satellite signals several factors may affect the availability and accuracy of wireless and satellite navigation and correction services e g GPS GNSS SBAS etc Therefore Raven Industries cannot guarantee the accuracy integrity continuity or ava...

Page 3: ...3 Boom Installation 13 Install Harness Mount Blocks 13 AIM Command FLEX Nozzle Control Valve Installation 13 Best Practices and Recommendations 13 Boom Cable Routing and Connection 14 Best Practices and Recommendations 14 Secondary Boom Cable Routing and Connections 14 Primary Boom Cable Routing and Connections 15 System Diagram 17 Chapter 4 AIM Command FLEX Adapter Harness Installation 19 Adapter...

Page 4: ...Table of Contents ii AIM Command FLEX Patriot MY 2017 Installation Manual ...

Page 5: ...ne Do not drive the machine with equipment enabled on any public road Determine and remain a safe working distance from other individuals The operator is responsible for disabling AIM Command FLEX when the safe working distance has been diminished Ensure AIM Command FLEX is disabled prior to starting any maintenance work on the system or the implement AGRICULTURAL CHEMICAL SAFETY Thoroughly bleed ...

Page 6: ...The word harness is used to mean all electrical leads and cables bundled and unbundled When installing harness secure it at least every 30 cm 12in to the frame Follow existing harness as much as possible and use these guidelines Harness should not contact or be attached to Lines and hoses with high vibration forces or pressure spikes Lines and hoses carrying hot fluids beyond harness component spe...

Page 7: ... or operators might step or use as a grab bar Damage when passing through metal structures IMPORTANT Avoid directly spraying electrical components and connections with high pressure water High pressure water sprays can penetrate seals and cause electrical components to corrode or otherwise become damaged When performing maintenance Inspect all electrical components and connections for damage or co...

Page 8: ...ove during machine operation Allow sufficient length for free movement without interference to prevent pulling pinching catching or rubbing especially in articulation and pivot points Clamp hoses securely to force controlled movement to occur in the desired hose section Avoid sharp twisting or flexing of hoses in short distances Protect hoses from Foreign objects such as rocks that may fall or be ...

Page 9: ...5 IMPORTANT SAFETY INFORMATION Remove visible surface water from components connections or seals using pressurized air or an aerosol electrical component cleaning agent Allow components to dry completely before reconnecting cables ...

Page 10: ...CHAPTER 1 6 AIM Command FLEX Patriot MY 2017 Installation Manual ...

Page 11: ...riot Make and Model Information REQUIRED COMPONENTS The following components must be installed with the AIM Command FLEX nozzle control system Updated software on field computers or control monitors PWM pump control valve Case IH compatible flow meter Case IH compatible pressure transducer 80 or finer mesh strainer NOTE Air induction style spray tips should not be used with the AIM Command FLEX no...

Page 12: ...rmarket P N 117 1007 140 Patriot MY 2017 and Newer 80 Boom 20 Spacing ARAG Aftermarket P N 117 1007 141 Patriot MY 2017 and Newer 120 Boom 20 Spacing Wilger Aftermarket P N 117 1007 142 Patriot MY 2017 and Newer 100 Boom 20 Spacing Wilger Aftermarket P N 117 1007 143 Patriot MY 2017 and Newer 90 Boom 20 Spacing Wilger Aftermarket P N 117 1007 144 Patriot MY 2017 and Newer 80 Boom 20 Spacing Wilger...

Page 13: ...ictured Clamp Harness Mount ACF 118 0159 061 152 128 116 104 152 128 116 104 Not Pictured Block Harness Mount Double Leg ACF 118 0159 062 62 59 53 48 62 59 53 48 Not Pictured Block Harness Mount Single Leg ACF 118 0159 063 14 5 5 4 14 5 5 4 Not Pictured Clamp Saddle Harness Mount 118 0159 064 4 4 4 2 4 4 4 2 CHN Nozzle Control Valve ARAG 063 0173 810 72 60 54 48 CNH Nozzle Control Valve Wilger 063...

Page 14: ... 107 0172 508 4 4 4 4 4 4 4 4 Not Pictured Guard ACF Harness 107 0172 509 2 2 2 2 2 2 2 2 Not Pictured Spacer U Bolt 107 0172 510 10 8 8 8 10 8 8 8 Not Pictured Bracket Electrical Bulkhead 107 0172 512 6 4 4 4 6 4 4 4 Not Pictured Kit CNH System Service ARAG 117 1005 066 1 Not Pictured Kit CNH System Service Wilger 117 1005 065 1 Picture Item Description Part Number Qty 117 1007 138 139 140 141 14...

Page 15: ...l AIM Command Flex ARAG 117 1005 051 3 Not Pictured AIM Command Flex Valve Jumper 115 7303 139 2 Single O Ring Viton Brown Size 116 219 1005 116 1 Valve Tool 321 0000 457 2 Flynut Wrench 321 0000 459 1 Picture Item Description Part Number Quantity CNH Nozzle Control Valve Wilger 063 0173 809 1 Not Pictured Kit Seal AIM Command Flex Wilger 117 1005 052 3 Not Pictured AIM Command Flex Valve Jumper 1...

Page 16: ... of our product documentation and the overall service we provide We appreciate the opportunity to see ourselves as our customers see us and are eager to gather ideas on how we have been helping or how we can do better To serve you best please send an email with the following information to techwriting ravenind com AIM Command FLEX Patriot MY 2017 Installation Manual P N 016 0171 633 Rev B Any comm...

Page 17: ...he harness mounting block Wilger nozzle bodies use 5 16 x 3 4 bolts and 5 16 nuts Arag nozzle bodies use 1 4 x 3 4 bolts and 1 4 nuts AIM COMMAND FLEX NOZZLE CONTROL VALVE INSTALLATION BEST PRACTICES AND RECOMMENDATIONS If a dual channel turret nozzle body is installed on the implement always mount the AIM Command FLEX nozzle control valve to the straight nozzle port to avoid excessive pressure dr...

Page 18: ...AND RECOMMENDATIONS Route the AIM Command FLEX primary and secondary boom cables along existing cables or plumbing to help avoid damage to the cable Route cables to avoid pinch points and to avoid stretching the cable during folding and unfolding operations Pay special attention to cable routing near folding or break away points Route cables through existing cable retention devices as appropriate ...

Page 19: ...trol valve at the outer end of the boom 5 After connecting the harness to the NCV secure the tee in the cable using the provided harness mounting clamps FIGURE 4 Securing using Mounting Clamps 6 At each valve branch adjust the cable as necessary to provide slack between nozzle control valve connections 7 Repeat this procedure to route and connect the secondary boom cable on the opposite boom NOTE ...

Page 20: ...ry and secondary boom cables to ensure sufficient slack around the mid boom fold point and allow each cable to reach nozzle control valves near the folding point 6 Secure the primary and secondary connection using the supplied zip ties as necessary to protect the connector from damage during folding and unfolding operations 7 Once the primary and secondary boom cables are connected begin connectin...

Page 21: ...3 Boom Installation 17 BOOM INSTALLATION SYSTEM DIAGRAM ...

Page 22: ...CHAPTER 3 18 AIM Command FLEX Patriot MY 2017 Installation Manual ...

Page 23: ...e provided hardware to attach the fuse block to the rear of the center rack near the Product Controller II 3 Use the provided hardware to attach the three relays to the front side of the Product Controller II mounting plate FIGURE 1 Product Controller II 4 Route the 8 pin circular plug to the existing power bulkhead located on the left center rack lift arm Product Controller II Bolts for Relays Fu...

Page 24: ...cle to the mating plug located on the center rack below and to the left of the Product Controller II ECU FIGURE 3 12 Pin Deutsch 6 Route the connectors located Left Boom and Right Boom to the Primary AIM Command Flex nozzle cables installed in Primary Boom Cable Routing and Connections on page 15 Bulkhead Connector 12 Pin Deutsch ...

Page 25: ...ed u bolt spacer and M10 nuts to install an electrical bulkhead adapter bracket at the left and right boom connections FIGURE 4 Boom Connectors 8 Locate the fuse panel inside the battery compartment in front of the right rear wheel FIGURE 5 Fuse Panel 9 Install the 30 Amp fuses in the F7 F8 and F9 spots Fuse Panel ...

Page 26: ...CTOR BRACKETS ON END OF THE BOOM Install the nozzle deflector brackets as shown These brackets install on the end of the breakaway section of the boom They provide additional protection to the outer pair of nozzles FIGURE 6 Nozzle Deflector Brackets FIGURE 7 Nozzle Deflector Installation ...

Page 27: ...4 AIM Command FLEX Adapter Harness Installation 23 AIM COMMAND FLEX ADAPTER HARNESS INSTALLATION FIGURE 8 Deflector Bracket Installation ...

Page 28: ...CHAPTER 4 24 AIM Command FLEX Patriot MY 2017 Installation Manual ...

Page 29: ...ndustries Do Bring the defective part and proof of purchase to your Raven dealer If the dealer approves the warranty claim the dealer will process the claim and send it to Raven Industries for final approval The freight cost to Raven Industries will be the customer s responsibility The Return Materials Authorization RMA number must appear on the box and all documentation including proof of purchas...

Page 30: ...aven Industries will be the customer s responsibility The Return Materials Authorization RMA number must appear on the box and all documentation including proof of purchase must be included inside the box to be sent to Raven Industries In addition the words Extended Warranty must appear on the box and all documentation if the failure is between 12 and 24 months from the retail sale How Can I Get S...

Reviews: