Generally, the Sofia should be installed in a centrally located position within the home.  When 

deciding where to position the appliance, you must consider the following: 

1.

 

The place of installation of the pellet fire must comply with local and national 

regulations. The pellet fire must be fuelled only with quality pellets manufactured to 

standard AS/NZS 4014.6. The pellet fire cannot operate using traditional fire wood. 

2.

 

Do not install a pellet fire in a bedroom or room where people sleep. 

3.

 

Sofia has a convection fan which blows air in the direction the fire faces. For optimum 

performance and heat circulation, locate the pellet fire in a large and open room that is 

centrally located in the house. 

4.

 

The fire requires a 230 volt power supply and comes with a 2m plug in power lead. 

There must be easy access to the socket so the fire can be isolated from the power if 

required. If the cable supplied is not long enough to reach the nearest outlet, use a 

suitable 3 pin extension cord. A surge protector is recommended for use with all Ravelli 

pellet fires. 

Installing 

Installation of the Ravelli Sofia Wood Pellet Fire must be undertaken by an approved installer, who 

must then give the purchaser a declaration of conformity of the appliance and will assume all 

responsibility for the final installation and consequent correct function of the installed product. 

 

Please read this Manual thoroughly before commencing installation, as failure to follow the 

instructions could cause damage to the pellet fire or property. It is also necessary 

for the registered installer to take into consideration all the laws and national, regional, provincial 

and local regulations present in the country in which the appliance has been installed. In the event 

of failure to respect these precautions, Pellet Fire Solutions declines all responsibility. 

 

1.

 

The fire must be installed on a floor with sufficient carrying capacity. If the existing building 

does not meet this requirement, appropriate measures must be taken (i.e. a load 

distribution plate). 

2.

 

Sofia must be installed on a non-combustible surface. This surface must protrude a 

minimum of 150mm from the front of the closed pellet fire door and a minimum of 200mm 

from the side of the appliance. Please note that if a floating hearth is to be installed, an 

allowance must be made below the fire for installation of the chosen surround 

3.

 

Check clearances to combustibles (see “ Creating the Cavity”) to ensure sufficient space is 

created in the cavity, and that the position of structural elements near the proposed flue 

have adequate clearance. 

4.

 

Check clearance for service – as the Sofia is designed to be pulled out, as long as there is 

front access, this should be sufficient. 

5.

 

Check there is sufficient ventilation for combustion air and this is unaffected by mechanical 

extraction. An external air intake may be required. (see “Creating the Cavity” for cavity 

ventilation requirements). 

6.

 

There must be sufficient circulation of air in the room where the pellet fire is installed. Never 

open the door of the pellet fire while it is functioning. 

7.

 

Check there is a suitable flue location (studs, joists, rafters etc). 

8.

 

Sofia has been Safety Tested to AS/NZS 2918:2001 using the Davins manufactured flue, Test 

Report ARS 05/1185. Installation is not exclusive to these nominated kits, though an 

alternative flue should only be considered following consultation with your local council. 

9.

 

Because of the positive pressure in the flue, sealing of all 75mm stainless joints is mandatory 

- use high temperature Maniseal. Both inner and outer flue joints must be riveted using 

stainless steel rivets. 

Positioning and Installation of the wood pellet fire

Summary of Contents for SOFIA

Page 1: ...nsert Wood Pellet Fire Installation Specifications Safety testing of the Ravelli Sofia Insert Wood Pellet Burning Heater to AS NZS 2918 2018 Appendix B ARS 22 3116 22 3112R1 Flue Kit Testing to AS NZS...

Page 2: ...ly installed into a masonry Cavity Dimensions Sofia Insert Built In Heater Refer to Safety Test ARS 22 3116 22 3112R1 for all clearances to combustible 713 5 610 541 5 112 400 78 590 14 527 5 541 5 17...

Page 3: ...N Wall Opening D Width 760 mm E Height 625mm Additional Clearances to Combustibles K from exhaust spigot to cavity wall 100mm L from side of fire to cavity wall 150mm M hearth depth from front of glas...

Page 4: ...oduct being used is reproof rated above 80 C eg Promiaa Micore Supalux Eterpan or similar NOTES 150mm 150mm 100mm Promina board Promina board 1 Angle section for support fixed to timber frame floor us...

Page 5: ...alled In the event of failure to respect these precautions Pellet Fire Solutions declines all responsibility 1 The fire must be installed on a oor with suf cient carrying capacity If the existing buil...

Page 6: ...mbustible Mantle To be zero rated using eterpan e with a 12mm air gap to comply AS NZS 2918 2018 10 Before connecting the pellet fire electrically the connection of the exhaust spigot must be complete...

Page 7: ...oach screws Thickness of ooring must be 20mm minimum The ooring shall be xed to the nearest joist with two 8g x 40 screws per hold down anchor Fixing to Timber Floor Framing Minimum 14g x 60 screws 6...

Reviews: