Operation E-CLICK
21
4
4.5
Spreading using E-CLICK
Spreading procedure
1.
Start moving with the tractor.
2.
Start spreader discs.
3.
Open the required metering slide by switching the toggle switches to the
OPEN
position.
The metering slides open.
The fertiliser is applied.
4.
Close the required metering slide by switching the toggle switches to the
CLOSE
position.
Close the metering slide.
No fertiliser will be applied.
5.
Stop spreader discs.
6.
Stop the tractor.
Spreading is finished.
NOTICE
Please observe the operating manual of your mineral fertiliser spreader!
NOTICE
While moving, the LEDs light in
orange
, irrespective of the direction of the
movement!
Summary of Contents for E-CLICK
Page 4: ...Table of Contents II ...
Page 8: ...User instructions 1 6 ...
Page 14: ...Layout and function 2 10 ...
Page 18: ...Attachment and installation 3 14 ...
Page 26: ...Operation E CLICK 4 24 ...
Page 28: ......