1 | MI_2123: Second water connection - removal and installation
11 / 104
General information
The customer does not need to dismantle the second water pipe that they have
made available for the unit. The second water connection on the unit makes use
of the additional water supply, which means that it is regularly flushed. The con-
nection hose from one of the two water taps (via optional connections) is placed
in the unit and directly connected. The second water connection operates the
hand shower.
Safety instructions
DANGER
High voltages when connecting to the mains power
Danger to life due to high voltage.
n
Disconnect from the power supply.
n
Make sure the unit is disconnected from the power.
CAUTION
Sharp edges on the housing
Risk of cuts on the housing when working in the unit.
Wear protective gloves.
Work steps - installing the second water connection
a
The unit is voltage-free and the electrical compartment is open.
1.
Only valid for table-top units
: Remove the hose from the emergency over-
flow.
Only valid for floor units
: Remove the expanding rivet from the pump board
holder on the bottom of the unit and remove the holder.
2. Open the inlet at the cable entry of the perforation by knocking out the per-
forated sheet using a hammer and screwdriver.
3.
For table-top units:
For gas and electric units with built-in expansion
boards, if the front inlet (6) is already occupied, use the inlet (5) here. Use
the inlet (6) for all other electric units.
5
6
Summary of Contents for MI 2123
Page 8: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 34: ...1 MI_2123 2 34 104 2 1 3 4 1 DIN 8675 M20x1 5 A2 2 3 1 3 1 4 1 2 2 2 1 2 n n 2 a 1...
Page 35: ...1 MI_2123 2 35 104 2 3 6 5 6 5 6 4 5 6 5 6 5 4 1 1 4 6 2 1 1...
Page 36: ...1 MI_2123 2 36 104 7 7 8 4 7 8 8 7 9 2 8 3 2 1...
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 46: ......
Page 47: ......
Page 48: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 58: ...1 MI_2123 58 104 f SR 60 77 082 2 1 3 4 1 2 DIN 8675 M20x1 5 A2 3 1 3 1 4 1...
Page 59: ...1 MI_2123 59 104 n n a 1 2 3 6 5 6 5 6...
Page 60: ...1 MI_2123 60 104 4 5 6 5 6 5 4 1 1 4 6 1 1 7 7 8 4 7 8 8 7 9 2 8 3 1...
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 78: ......
Page 79: ......
Page 80: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 82: ...1 MI_2123 82 104 SR 60 77 082 2 1 3 4 1 DIN 8675 M20x1 5 A2 2x 3 1x 3 1x 4...
Page 83: ...1 MI_2123 83 104 n n a 1 2...
Page 84: ...1 MI_2123 84 104 3 6 5 6 5 6 4 5 6 5 6 5 4 1 1 4 6 1 1...
Page 85: ...1 MI_2123 85 104 7 8 7 4 7 8 8 7 9 2 8 3 1...
Page 86: ......
Page 87: ......
Page 88: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 93: ......
Page 94: ......
Page 95: ......
Page 96: ...80 00 562 V02 12 2021 RTS Awei ml...
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ...80 00 562 V02 12 2021 RTS Awei ml...