background image

Pre-Installation Requirements

1. Internet Connection:

    • Routed internet connection using DHCP 

      (Network must use private IP address ranges 10.X.X.X or 192.X.X.X or 172.X.X.X)

      

OR

    • Cellular modem with data (available from RATH

®

)

2. 

Laptop with a network connection for testing

3. Power Option:

 2100-SVE Ethernet Extenders    

4.

 SmartView Controller, SmartView Display, and SmartView Camera

5. 

YES and NO or DOOR OPEN and DOOR CLOSE buttons

Hardware Mounting

1.

 Mount the SmartView Controller in the elevator using the provided adapter plate or mounting kit.

2.

 Mount the Camera in the panel or ceiling of the elevator using the provided hardware. The Camera must be no 

    more than 15 feet from the Controller.

3. 

Connect the Camera to the Controller using the provided USB cable.

4. 

Mount the SmartView Display in the elevator panel. The Display must be no more than 20 feet from the Controller.

    

Note:

 Reference Appendix A for Display part numbers and window thickness.

5

. Connect the Display to the Controller using the provided HDMI cable.

6. 

Connect the Display power output (J10) to the SmartView Display power input using the provided cable.

    

Note:

 The Controller output power (J10) is only compatible with the SmartView Display.

    

Note: 

For use with the CE Elite Pi Display, you must order the Display with the proper software and also the correct 

    SmartView Controller part number.

7. 

Connect the button designated for “YES” to the Controller terminal labeled “YES”.

8. 

Connect the button designated for “NO” to the Controller terminal labeled “NO”.

    Note:

 Use 24AWG wire minimum and 18AWG wire maximum.

Powering Options

1. 2100-SVE Ethernet Extenders

    a. Reference diagram on page 5 as a guide.

    b. Place the main injector unit and UPS in the machine room or network room.

    c. Connect the provided Ethernet cable from a routed network switch to the LAN/PoE port on the main injector.

    d. Plug the included power supply into the UPS.

    e. Use an existing single pair or run a single pair of wire from the main injector unit to the remote extender unit.   

        

Note:

 18AWG wire is recommended.

    f.  Using the provided RJ45 adapters, wire to pins 1 and 2 and connect the adapters to the Interlink port on the main 

        injector and Interlink port on the remote extender.

    g. Connect the provided Ethernet cable from the PoE Out port on the remote extender to the Ethernet port on the 

        Controller Board.

 

Installation

Page 3

N56W24720 N. Corporate Circle    Sussex, WI 53089

800-451-1460    www.rathmicrotech.com

Summary of Contents for JANUS SmartView

Page 1: ...56W24720 N Corporate Circle Sussex WI 53089 800 451 1460 www rathmicrotech com SmartView Visual Communication System Installation Operations Manual ARE YOU TRAPPED RP850001SV Ver 12 8 22 WARRANTY 2YEA...

Page 2: ...nced customer support teams are available to remotely assist with site preparation installation and maintenance It is our sincere hope that your experience with us has and will continue to surpass you...

Page 3: ...Display power input using the provided cable Note The Controller output power J10 is only compatible with the SmartView Display Note For use with the CE Elite Pi Display you must order the Display wit...

Page 4: ...d and fully seeded The Software says device is offline or not connecting Verify the Controller has a routed internet connection and a minimum of 5MB S Verify building s network starts with an IP addre...

Page 5: ...ain Extender to remote Extender Ethernet Patch Cable from communication source to main Ethernet Extender Ethernet Patch Cable from remote Ethernet Extender to SmartView Controller Machine Room Elevato...

Page 6: ...xtender Main Unit Injector has LAN PoE internet connection and Interlink two wire connection Remote Unit Extender has Interlink two wire connection from main unit and LAN PoE Ethernet connection to Sm...

Page 7: ...SmartView Camera Specifications Powered by Controller Power Requirements Active 5v 0 12A Idle 0v 0A Operating Temperature 32 F to 140 F 0 C to 60 C SmartView Display Specifications Powered by Controll...

Page 8: ...Page 8 SmartView ID Location Description 10020 Elevator 1 10021 Elevator 2 SmartView ID Location Description ID Table Appendix B Example ID Table...

Reviews: