2
WINTERIZING
1. Rinse tank thoroughly with freshwater and wipe
out tank.
2. Shut off pressurized freshwater, disconnect and
drain pressurized freshwater line.
3. Rinse tubing screen and T-Check valve assembly
thoroughly with freshwater.
INSTALLATION/ MOUNTING
Locate salt feed tank within six feet (1.8 m) of and on
the same level as toilet. Make sure tank is accessible
for refilling. Secure salt feed tank (see Fig. #1).
PLUMBING
4. Attach T-Check valve in intake line (suction) of
toilet (see Fig #3).
5. Attach tubing to T-Check valve.
6. Modify intake check valve of toilet.
NOTE: Following part numbers refer to toilet
parts and not in the T-Check valve. When
connecting to a PHII, remove #1201 and #LWS;
for Crown Heads remove #CH12 and #CH8; for
Crown Head II and Atlantes models replace #RCV
with T-Check valve provided.
Other types of toilets need not be modified unless
they have an additional built in check valve.
7. Install overflow hose to bilge.
8. Connect pressurized freshwater with a shutoff
valve to the barbed nipple at the top of tank (see
Fig. #3).
Fig. #2 Four Gallon Salt Feed Exploded View
L288B 0917jlc
Float Valve
Assembly
(31-331)
Overflow Hose
(Not Supplied)
T-Check Valve
Assy.
(31-307W)
Plastic Tubing
Clamp
(31-304C)
Suction Line
Strainer
(31-313)
Tank with
Lid
(31-330)
Inlet
Connection
Fitting
F209
(2)
I93
31-340
31-341
Float Valve
Assembly
(31-331W)
31-338
F207
(2)
F208
(2 - NOT
SHOWN)