Step 2:
• Remove the spud from the bowl
• Install new spud on the bowl
• Install vacuum breaker
Step 3:
• Install pump and the flapper
valve to the base
• Use 1228C plastic washer if
needed. NOTE: Bases that
have the washer already
molded into the base do not
require the 1228C
• Install flapper with correct
orientation
Step 4:
• Install new ½” hose from inlet
valve outlet to vacuum breaker.
NOTE: Length of hose can be
shortened if needed
Step 1
• Remove pump (PHII or others) from the base.