background image

 Step 2:

 

 

•  Remove the spud from the bowl

 

•  Install new spud on the bowl

 

•  Install vacuum breaker

 

 Step 3: 

  •  Install pump and the flapper 

valve to the base

  •  Use 1228C plastic washer if 

needed. NOTE: Bases that 

have the washer already 

molded into the base do not 

require the 1228C

  •  Install flapper with  correct 

orientation

 Step 4:

 

  •  Install new ½” hose from inlet 

valve outlet to vacuum breaker. 

NOTE: Length of hose can be 

shortened if needed 

 Step 1

   •  Remove pump (PHII or others) from the base.

Reviews: