background image

7. Operation 

7.1 Waste oil collection:
7.1.1. Before start working always check with level indicator pos. 7 how much
 

  waste oil is within the container. In case the container is too full, please

 

  empty first as explained in chapter 

7.1.2. Place the unit below the oil drain outlet. Push up the collection pan as far 

as

 

  possible and secure with clamping screws.

7.1.3. Open the filler valve Pos.3, and air inlet valve at Pos. 6, by unscrewing 

them

 

  until the venting slots are unblocked.

7.1.4. Now waste oil flow in.

7.2 Emptying of the container
7.2.1. Place the unit besides the waste oil collection tank. Push down the 

collection

 

  pan as far as possible and secure with clamping screws.

7.2.2. CAUTION! It is indispensable to close the filler valve Pos. 3, and air inlet
 

  valve at Pos. 6..

7.2.3. Insert male adapter (with hose Pos. 11) into the female adapter Pos: 15 

and

 

  fix it.

7.2.4. Open emptying valve (with hose pos.11).
7.2.5. Establish a compressed air connection to Pos. 6 by using a tyre 
 

  inflator. Fill the container with 0,5 bar. Container will be cleaned out 

7.2.6. After the container is empty disconnect the compressed air and let the
 

  pressure within the container completely leaking out of the container.

7.2.7. Close drain valve (with hose Pos. 11)
7.2.8. Clamp in hose Pos. 11 to the holder Pos. 13

8. Maintanence and trouble shooting

8.1 Before every use all parts of the unit which are getting in contact with 
 

the medium have to be checked carefully if there are leaks or damages, 

 

and if so eliminate.

8.2 In case of spilled waste oil pick it up with suitable means and remove it
 

properly. No waste oil may pollute soil or sewerage system.

8.3 If necessary, inside of container can be cleaned by filling in and
 

emptying Diesel.

9. Disposal

9.1Completely empty  all parts of the equipment ( hoses, pumps , tanks , etc 

) and given case blown out with air .

9.2 dangerous parts of the appliance must be made unusable f.e. perforate 

6

+49 (6158) 92980-0

Summary of Contents for AOG 1003/3

Page 1: ...17 i Weiterentwicklung im Sinne des Fortschrittes behalten wir uns vor Technical Modifications are subject to change Details techniques subject modification sans avis pr alable O P T I M I Z E S W O R...

Page 2: ...moved Always wear safety cloths respecting the applicable regulations for accident prevention Only use this device conforming to its purpose and function Improper use can cause severe injuries Caution...

Page 3: ...and may not be changed 3 Technical data 4 Description 5 Assembling Installation 5 1 Screw collection pan pos 2 on the filling pipe pos 4 and seal withTeflon tape 5 2 Put the funnel sieve top pos 1 on...

Page 4: ...he rollers Screw the nuts onto the threaded bolts and tighten it carefully Insert the castors Pos 10 to the axle Secure the castors by screwing in the shouldered screw into the threaded hole of the ax...

Page 5: ...9 3 KGH25 20 562 10 Wheel KR G 3 50 528 4 Clamping screw 50 513 11 S uction emtying hose S AS 51 520 5 F iller pipe 50 514 12 Collection pan sieve 50 519 5a Gasket kit DSE F R 50 523 13 Hose clamp 50...

Page 6: ...7 2 4 Open emptying valve with hose pos 11 7 2 5 Establish a compressed air connection to Pos 6 by using a tyre inflator Fill the container with 0 5 bar Container will be cleaned out 7 2 6 After the c...

Page 7: ...ed with by the user 10 Warranty 10 1 In case of insufficient maintenance faults on operation use of not adequate spare parts or attachments all liabilities and rights of claim under guarantee are void...

Page 8: ...Fax 49 6158 92980 50 info rapid group de Rapid Group GmbH Bahnhofstra e 53 55 64560 Riedstadt Telefon 49 6158 92980 0 www rapid group de 8 49 6158 92980 0...

Reviews: