19
EC
Hydro
Midsize
BELT REPLACEMENT
CUTTERDECK BELT
1. Remove PTO belt.
2. Rotate idler arm using a 3/8" (9mm) ratchet or
breaker bar and remove belt.
3. Replace in the reverse order.
PUMP-DRIVE BELT
1. Remove PTO belt from the engine clutch.
2. Disconnect the clutch wire harness.
3. Unbolt clutch bracket from clutch and rotate the
clutch to allow enough clearance to remove the
clutch bracket.
4. Rotate idler arm using a 3/8" (9mm) ratchet or
breaker bar inserted into the square hole in the
idler arm.
5. Remove pump drive belt.
6. Replace by following steps in reverse order.
PTO BELT
1. Rotate idler arm using a 3/8" (9mm) ratchet or
breaker bar and remove belt.
View under engine deck
Summary of Contents for 933308G
Page 24: ...24 EC Hydro Midsize SPECIFICATIONS...
Page 25: ...25 EC Hydro Midsize SPECIFICATIONS...
Page 27: ......
Page 28: ...Ransomes Jacobsen Limited Ransomes Way Ipswich England IP3 9TT...