TF2005101-OG-01 ENG
Page 11 of 17
20190618 V.2
6A
Lid Handle
1
7
T-Star Stand
1
8
Lifter
1
9
Thermometer
1
10
Hanging Hook
1
11
Timer Support Bar
1
Hardware
A
Bolt M6 x 12
4
B
Nut M6
2
C
Bolt M6 x 10 (Silver)
2
D
Nut M6 (Silver)
2
Assembly Instructions
1. Attach burner (2) to automatic shut off valve (A) in the timer control
box (3) by turning the burner clockwise. Do not fully tighten burner
to the valve, tighten until
3 threads
remain visible on the valve.
Attach thermocouple (D) to thermocouple bracket (E) which has
been fixed to the burner.
Proper connection is
critical for correct
operation of unit