12
SECTION 8
AIR TANk/ TOwER ASSEMBLY
1. Using a fork lift or other lifting device, lower the Tank/
Tower onto the base and align the holes.
2. Attach the Tank / Tower assembly to the Base using the
four bolts on the Tower Base Plate. (See Fig 8.1)
3. Connect the other end of the Air Inflation Hose to the
Push to Connect Fitting underneath the Air Inflation Box As-
sembly. (See Fig 8.2)
SwINg ARM / VERTICAL SHAfT /
MOuNT-DEMOuNT HEAD ASSEMBLY
1. Raise the Vertical Shaft / Mount-demount Head assem-
bly to the highest position and lock it in place by pushing the
Locking Handle up.
2. Check the Socket Head Cap Screw on the Cap, tighten
if necessary. (See Fig 8.5)
3. Check the operation of the Vertical Shaft and the Lock-
ing Handle. (See Section 15, Page 29 for Lock adjustment
details)
4. Check that the Chuck is tightened. (See Fig 8.6)
ANCHORINg
It is not essential to anchor the machine to the floor,
however, the floor must be smooth and level. When anchor-
ing to a concrete floor use the mounting holes that are pro-
vided in the frame. Make sure the machine is solid and level
and supported evenly on all anchor points. Solid shims may
be used if necessary. (See Fig 8.7)
Fig 8.1
Fig 8.6
Fig 8.5
Fig 8.2
Fig 8.7
Socket Head
Cap Screw
Vertical
Shaft to
Highest
Position
Cap
Locking
Handle
Summary of Contents for R30XLT
Page 34: ...34 ...
Page 38: ...38 ...
Page 43: ...43 ...
Page 45: ...45 ...
Page 46: ...46 RECORD ALL MAINTENANCE NOTES AND SERVICE HISTORY HERE ...
Page 47: ...47 TIRE AND WHEEL DATA ...