background image

For technical support, contact us at 1-800-565-5321

5044 Installation Guide  |  REV.B2  |  Page 3

54-6080

PHASE 1 – ASSEMBLY

1.1 SETUP

1.1.1   Unpack all the components and compare with the bill of materials.

1.1.2   Verify all parts are present.

Item No.

Description

Qty.

54-6080

Raised Base, Cab Box, Sprinter

1

90-5020

Install Fastener Kit

1

BILL OF MATERIALS

90-5020 Fastener Kit

Fastener Install

1.1.3   Fastener  kits.

#92-104 Screw   #14 × 1-1/4"

# 92-104

Screw HWH
#14 × 1-1/4"
ZINC 

#90-108 Hex Bolt    1/4”-20 × 5/8"

#98-112 Flat Washer

#94-112 Serrated Nut

# 94-112

Serrated Nut
1/4"-20
ZINC 

Hex Bolt
1/4"-20 × 5/8"
ZINC 

# 90-108

# 98-112

Flat Washer
1/4", 3/4" OD
ZINC 

Reviews: