![Range Road RRF940 Manual Download Page 7](http://html1.mh-extra.com/html/range-road/rrf940/rrf940_manual_3626921007.webp)
7
(3)Assembling of start lever
After assembling the stretching device as described in the above 3-3-(2),insert a lever B into
the bush portion at the top of the stretching device,and insert the bush into a bottom lever
A,fixing using a bolt and a flange nylon nut
It should be noted that if the bolt and the flange nylon nut are tightened extremely,the pipes of the
levers A and B may be deformed
4.Installation and movement
1.Installation
If the machine is moved at a high speed on a slope,rugged ground or along a sharp curve,it can
happen that the machine falls down on its side or tumbles down accidentally.Move slowly
If the machine is moved on a shoulder of a road with an incling side or side ditch,it can happen that
the machine tumbles down accidentally.Don’t move on a shoulder
If it is attempted to move the machine across a large level difference,it can happen that the use a
footboard
If a person rides on the machine,it can happen that the machine falls to injure
him.her.Furthermore,if the machine is moved with any thing placed on it,it can happen that the the
thing drops or that the machine falls down on its side to injure the persons working nearby.Do not
allow any person ot thing to be placed on the machine
In the case where the machine is mounted on the load carrying platform of a truck and fastened
using a rope or the like,do not wind the rope around the turn table for fixing it. The machine may be
broken
2.Inspection before start of operation
Be sure to inspect the machine before start of operation to ensure that the
machine can be used for a long period of time without any problem
Precaution
CAUTION
Precaution