Setup and operation with R&S
ZVA/ZVT
R&S
®
ZCxxx
41
Getting Started 1177.5156.02 ─ 05
R&S
ZVA50 and R&S
ZVA67 require additional 1.85 mm to 2.92 mm adapters to
connect the cables. These adapters are offered as complementary adaption kits
(see
Chapter A.1.4, "Adaption Kits R&S
1. Connect MEAS OUT of the converter to the VNA. Use the MEAS IN connector
of the VNA port that provides the RF source signal.
2. Connect REF OUT of the converter to the REF IN connector of the same VNA
port.
Figure A-2: Test setup for 2-port transmission measurement with a VNA with four sources
A.1.4
Adaption Kits R&S
ZCAK
As explained in the previous sections, depending on the VNA model, additional
adapters, power splitters and angled adapters may be required to connect the
cables. Rohde & Schwarz offers three different adaption kits R&S
ZCAK to meet
the requirements of different VNAs:
●
For the R&S
ZVA24 var. 28 and the R&S
ZVA40 var. 48 (VNAs with four sour-
ces), Rohde & Schwarz offers the adaption kit R&S
ZCAK Var. 24 (order num-
ber 1323.7746.24).
Connecting the RF cables