SELECTING A LOCATION FOR YOUR NEW UNIT

The following conditions should be considered when selecting a location for your
unit:

1.

Floor Load:

The area on which the unit will rest must be level, free of

vibration, and suitably strong enough to support the combined weights
of the unit plus the maximum product load weight (PH120E2 max floor
load = 1870 lbs.).

2.

Clearance:

There must be a combined total of at least 3

clearance on

all sides of the unit.

3.

Ventilation:

The air cooled self contained unit requires a sufficient

amount of cool clean air.

Avoid surrounding your equipment stand

around other heat generating equipment and out of direct sunlight.
Also, avoid locating in an unheated room or where the room
temperature may drop below 55

°

F or about 90

°

F.

INSTALLATION CHECKLIST

After the final location has been determined, refer to the following checklist prior to
start-up:

1. Check all exposed refrigeration lines to ensure that they are not kinked,

dented, or rubbing together.

2. Check that the condenser and evaporator fans rotate freely without

striking any stationary members.

3. Unit must be properly leveled; check all legs or casters to ensure they

all are in contact with the floor while maintaining a level work surface.
Adjusting bullet feet heights or shimming casters may be necessary if
the floor is not level.

NOTE: Damage to equipment may result if not

followed.

Randell is not responsible for damage to equipment if

improperly installed.

4. Plug in unit and turn on main on/off power switch.
5. Allow unit time to cool down to temperature.

If temperature

adjustments are required, the temperature control is located within the
cabinet on the front face of the evaporator coil behind the thermometer
(Note: The left set of drawers or center set for a 6 drawer unit must be
removed to access the temperature adjustment control).

6. Refer to the front of this manual for serial number location.

Please

record this information in your manual on page 3 now.

It will be

necessary when ordering replacement parts or requesting warranty
service.

7. Confirm that the unit is holding temperature. Set controls to desired

temperature for your particular ambient and altitude.

8. Allow your unit to operate for approximately 2 hours before putting in

food to allow interior of unit to cool down to storage temperature.

NOTE: All motors are oiled and sealed.
NOTE: Unit is shipped from factory with service valves opened ready for
operation.

Summary of Contents for PH120E2-220

Page 1: ...e a claim with the carrier We recommend that you do so at once Manufacture Service Questions 888 994 7636 P N OMANUAL_MNL0504 05 05 1055 Mendell Davis Drive Jackson MS 39272 888 994 7636 fax 888 864 7636 randell com This manual provides Installation Operating instructions for PIZZA HUT MAKETABLE For Models PH120E2 Information contained in this document is known to be current and accurate at the ti...

Page 2: ......

Page 3: ...e of Randell food service equipment and welcome to the growing family of satisfied Randell customers Our reputation for superior products is the result of consistent quality craftsmanship From the earliest stages of product design to successive steps in fabrication and assembly rigid standards of excellence are maintained by out staff of designers engineers and skilled employees Only the finest he...

Page 4: ......

Page 5: ...Randell Manufacturing reserves the right to make changes in design and specifications without prior notice NOTICE Please read the entire manual carefully before installation If certain recommended procedures are not followed warranty claims will be denied MODEL NUMBER _________________________ SERIAL NUMBER _________________________ INSTALLATION DATE _____________________ The serial number is loca...

Page 6: ... window to allow for shipment installation and set up In the event equipment was shipped to a site other than the final installation site Randell will warranty for a period of three months following installation with proof of starting date up to a maximum of eighteen months from the date of purchase 2 Free ground freight of customer specified location for all in warranty parts within continental U...

Page 7: ...or sent back freight prepaid Decisions on whether or not to send complete condensing units will be made by Randell s in house service technician WHEN OPTIONAL LABOR EXTENSION POLICY APPLIES Randell Manufacturing will provide reimbursement of labor invoiced to any customer that has an optional labor extension of our standard warranty Reasonable geographic and industry rates do apply Randell offers ...

Page 8: ...ments for previously purchased equipment SANITATION REQUIREMENTS Certain areas require specific annotation requirements other than N S F U L standards Randell must be advised of these specifications before fabrication of equipment In these special circumstances a revised quotation may be required to cover additional costs Failure to notify Randell before fabrication holds the dealer accountable fo...

Page 9: ...damages must be filed immediately within 10 days by the consignee with the freight carrier and all cartons and merchandise must be retained for inspection RETURNED GOODS Authorization for return must first be obtained from Randell before returning any merchandise Any returned goods shipment lacking the return authorization number will be refused all additional freight costs to be borne by the retu...

Page 10: ...l dimension to top of hood Optional Ticket Rail adds approximately 17 to height Model L D H Work Hgt Doors H P Voltage Amps Ref Qty NEMA Ship Wt PH120E2 120 40 57 35 4 24 _ 115 60 1 16 R404A 40oz 5 20P 865 PH120E2 220 120 40 57 35 4 24 _ 220 50 1 7 R404A 40oz Hardwire 865 ...

Page 11: ... properly leveled check all legs or casters to ensure they all are in contact with the floor while maintaining a level work surface Adjusting bullet feet heights or shimming casters may be necessary if the floor is not level NOTE Damage to equipment may result if not followed Randell is not responsible for damage to equipment if improperly installed 4 Plug in unit and turn on main on off power swi...

Page 12: ...re located on the serial number tag located inside the mechanical housing NOTE It is important that a voltage reading be made at the compressor motor electrical connections while the unit is in operation to verify the correct voltage required by the compressor is being supplied Low or high voltage can detrimentally affect operation and thereby void its warranty NOTE it is important that your unit ...

Page 13: ...p EVENING SHUT DOWN 1 Remove product from rail at the end of the day s preparation The product may be stored in the refrigerated base compartment 2 Turn off rail with the switch located on the front mechanical panel of the unit 3 Rail cleaning may be performed at this time if the frost has melted off the rail surface Randell has attempted to preset the cold controls to ensure that your unit runs a...

Page 14: ...ent can be made The maximum highest setting is 38 degrees and the minimum lowest setting is 28 degrees If the settings need to go above or below this point there may be other contributing factors as to the cause of the temperature variances please contact the factory at 1 800 621 8560 The base temperature can also be adjusted by the temperature control dial located on the front of the refrigeratio...

Page 15: ...ly basis with a solution of warm water and a mild detergent to extend gasket life NOTE DO NOT USE SHARP UTENSILS RECOMMENDED CLEANERS FOR YOUR STAINLESS STEEL INCLUDE THE FOLLOWING JOB CLEANING AGENT COMMENTS Routine cleaning Soap ammonia detergent Medallion Apply with a sponge or cloth Fingerprints and smears Arcal 20 Lac O Nu Ecoshine Provides a barrier film Stubborn stains and discoloration Cam...

Page 16: ...SA member Most repair companies offer this service at very reasonable rates to allow you the time you need to run your business along with the peace of mind that all your equipment will last throughout its expected life These services often offer guarantees as well as the flexibility in scheduling or maintenance for your convenience Randell believes strongly in the products it manufactures and bac...

Page 17: ...difoodservice com 15 Electrical Diagram ...

Page 18: ...fan and motor 3 Compressor faulty 3 Call for service at 800 621 8561 4 Overload repeatedly tripping 4 Check outlet voltage Unit runs constantly 1 Condenser coil dirty 1 Clean coil 2 Condenser fan faulty 2 Service condenser motor Unit not cold enough 1 Temperature control set too high 1 Adjust control to lower setting 2 Temperature control faulty 2 Test control 3 Condenser coil dirty 3 Clean coil 4...

Page 19: ...difoodservice com 17 Replacement Parts List Pizza Hut Maketable PH120E2 ...

Page 20: ...18 800 621 8560 ...

Page 21: ... IN GSK1010 12 Door Hinge Bushing HD BSH050 13 Shelf Holding Pin HD PIN0102 14 Wire Shelf 19 1 8 x 25 _ HD SHL060 15 Bracket for shelf support RP BRK0107 16 Fan Register Back PH BAR0502 17 Evaporator Coil 53 x4 x1 with brackets RF COI0002 18 Drain Screen 2 RP DSN002 19 Evaporator Fan Motor Rail EL MTR0101 20 Fan Mounting Box RP BRK0501 21 Left Duct Box RP DCT0501 21A Center Duct Box RP DCT0500 21B...

Page 22: ...tor Coil Assembly RP CSY108SL 40A Evaporator Coil RF COI107 41 Solenoid Valve for Base Coil Assembly RF SOL9801 42 Shield Panel for Base Coil Assembly RP PNL107 43 Compressor RF CMP9901 44 Condensing Unit RF CON800E 45 Pressure Control RF CNT750 46 Dixell Temperature Control for Rail RF CNT0101 47 Magnet Striker Plate HD STR9901 48 Rocker On Off Switch EL SWT140 49 Digital Thermometer for Base HD ...