Silvia PID Installation Guide
Part A
Version 2.04
Copyright © 2006, 2008 MLG Properties, LLC
Page A-12
A word about routing the SSR power leads:
as the photo immediately above shows,
it
is best to route the SSR leads (the new red wires) up from below. That way, the factory
female connectors can remain in about the same orientation as when they were connected
to the thermostat. This minimizes the likelihood of pulling something loose – and is
therefore recommended. (Please note that in addition to the SSR power leads, this photo
depicts some new wires that you will install in an upcoming step).
Step A11 – Install low voltage control wires on SSR
Locate a pair of 22 gauge wires (one red, one white) as shown in picture below. One end
of each wire will be terminated with a ring terminal. The other end will be bare, stripped
wire.
This pair of wires will carry the low voltage DC control signals from the digital controller
to the SSR. You are going to connect the ring terminals to the low voltage DC side of the
SSR now. You will make the connection to the digital controller a little later.