www.raisecom.com
User Manual
10
Side 1
1
1
Side 2
Side 1
Side 2
3
5
7
4
6
2
8
3
5
7
4
6
2
8
1 = White/Orange
7 = White/Brown
1 = White/Orange
2 = Orange
3 = White/Green
4 = Blue
5 = White/Blue
6 = Green
7 = White/Brown
8 = Brown
2 = Orange
3 = White/Green
4 = Blue
5 = White/Blue
6 = Green
8 = Brown
2)
100M Crossover cable
1
1
7 = White/Brown
Side 2
Side 1
Side 1
Side 2
1 = White/Green
3 = White/Orange
3
5
7
4
6
2
8
3
5
7
4
6
2
8
1 = White/Orange
2 = Orange
3 = White/Green
4 = Blue
5 = White/Blue
6 = Green
7 = White/Brown
8 = Brown
2 = Green
4 = Blue
5 = White/Blue
6 = Orange
8 = Brown
4.5 Electrify the switch
¾
After installing the switch following the steps above, connect the switch to 220V AC power
supply using the provided power supply cable, and then the switch is electrified.
¾
After the electrifying, the indicator PWR will turn ON to indicate that the power supply of
the system is working.
¾
The switch will begin its self-check and initialization in succession. All the indicators on the
front panel of the switch will turn ON during this procedure.
¾
The switch will be in operating status after the self-check and initialization. The indicator
SYS will begin to flicker to indicate that the system in operating normally. The indicators for
Ethernet ports will show the status of their corresponding ports (ON or OFF according to the
settings and connection of the port).
¾
Here, if the switch is connected to PC via CONSOLE interface before electrifying and the
terminal software is correctly configured, the user management interface on which users can
operate over the switch will appear on the PC (For details, please refer to the corresponding
software configuration manual.).