ENGLISH
RAIS manual for Rais Geo
12
1
Locate the stove where it is to be installed, it cannot be moved once the
soapstone has been installed.
A
The rear flue connection can be installed after the third row of soapstone
has been positioned ( Geo 161 only ).
B
For top flue connection, remove the marked opening with a plastic or
rubber hammer.
C
Installation up to the ceiling, the easiest option is to use the Rais sliding
flue system and adaptor. The steel top plate should be pushed onto the
flue pipe.
2
Adjust the legs so that they are level.
Loosen the counter screw.
Adjust the leg.
Tighten the counter screw.
3
Position the soapstone as shown on the diagram and screw them together
with the enclosed mountings.
Depending on the choice of flue outlet, you are left with one piece of
soapstone, either number 7023 or 7033/7036.
4
Insert the firebox.
A
Ensure that the firebox is centred within the stove body, it must NOT
touch the soapstone.
B
If you are using the rear flue outlet option, ensure that the exit holes are
aligned.
Summary of Contents for GEO
Page 2: ...ENGLISH RAIS manual for Rais Geo 2...
Page 11: ...ENGLISH RAIS manual for Rais Geo 11...
Page 14: ...ENGLISH RAIS manual for Rais Geo 14...
Page 15: ...ENGLISH RAIS manual for Rais Geo 15...
Page 16: ...ENGLISH RAIS manual for Rais Geo 16...
Page 17: ...ENGLISH RAIS manual for Rais Geo 17...
Page 18: ...ENGLISH RAIS manual for Rais Geo 18...
Page 19: ...ENGLISH RAIS manual for Rais Geo 19...
Page 21: ...ENGLISH RAIS manual for Rais Geo 21...
Page 35: ...ENGLISH RAIS manual for Rais Geo 35...
Page 36: ...ENGLISH RAIS manual for Rais Geo 36...