EXTERNAL AIR CONNECTION – AIRSYSTEM
AIR CONNECTION THROUGH THE FLOOR, WITH
SWIVEL BASE
1. The gasket (6) must be placed on the floor, beneath the
swivel base (5). It can be bonded to the floor if necessary.
2. The air valve (3) is mounted on the bottom of the stove,
placing the gasket (2) between the stove and the air valve.
3. The flexible hose (4) is mounted on the connecting piece
on the combustion chamber and the air valve (3) and tensi-
oned using the hose clamps (1).
A-A ( 0,15 )
A
A
Thk x L x W
TITLE
PART NUMBER
QTY
ITEM
Slangebånd ABA Ø87/112
0710-SLANGEBÅND
2
1
Scotchmount klebeband 140/100
0005569
1
2
Stutzen mit Griff verzinktØ100
0710-studs-airsystem
1
3
Fleksslange Ø100x200 mm SRFC2
0710-FLEKSSLANGE 4
1
4
Turning Table complete
10-0000-1501
1
5
2 x 380 x 380
Celleneopren Ø380x120x2 m/klæb
0005568
1
6
Established:
Designer: Project manager:
Format:
Approved:
Drawing no.:
Revision:
Project:
Drawing name:
INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DENMARK
Phone +45 98 47 90 33 - Fax +45 98 47 92 91
E-mail: [email protected] - Homepage: www.rais.dk
Corrections:
D M Y
ksj
Air through floor with Turntable
08-06-2018
A3
10-0000-8610
10
1
4
1
3
2
5
6
A-A ( 0,15 )
A
A
Thk x L x W
TITLE
PART NUMBER
QTY
ITEM
Slangebånd ABA Ø87/112
0710-SLANGEBÅND
2
1
Scotchmount klebeband 140/100
0005569
1
2
Stutzen mit Griff verzinktØ100
0710-studs-airsystem
1
3
Fleksslange Ø100x200 mm SRFC2
0710-FLEKSSLANGE 4
1
4
Turning Table complete
10-0000-1501
1
5
2 x 380 x 380
Celleneopren Ø380x120x2 m/klæb
0005568
1
6
Established:
Designer: Project manager:
Format:
Approved:
Drawing no.:
Revision:
Project:
Drawing name:
INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DENMARK
Phone +45 98 47 90 33 - Fax +45 98 47 92 91
E-mail: [email protected] - Homepage: www.rais.dk
Corrections:
D M Y
ksj
Air through floor with Turntable
08-06-2018
A3
10-0000-8610
10
1
4
1
3
2
5
6
A-A ( 0,15 )
A
A
Thk x L x W
TITLE
PART NUMBER
QTY
ITEM
Slangebånd ABA Ø87/112
0710-SLANGEBÅND
2
1
Scotchmount klebeband 140/100
0005569
1
2
Stutzen mit Griff verzinktØ100
0710-studs-airsystem
1
3
Fleksslange Ø100x200 mm SRFC2
0710-FLEKSSLANGE 4
1
4
Turning Table complete
10-0000-1501
1
5
2 x 380 x 380
Celleneopren Ø380x120x2 m/klæb
0005568
1
6
Established:
Designer: Project manager:
Format:
Approved:
Drawing no.:
Revision:
Project:
Drawing name:
INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DENMARK
Phone +45 98 47 90 33 - Fax +45 98 47 92 91
E-mail: [email protected] - Homepage: www.rais.dk
Corrections:
D M Y
ksj
Air through floor with Turntable
08-06-2018
A3
10-0000-8610
10
1
4
1
3
2
5
6
A-A ( 0,15 )
A
A
Thk x L x W
TITLE
PART NUMBER
QTY
ITEM
Slangebånd ABA Ø87/112
0710-SLANGEBÅND
2
1
Scotchmount klebeband 140/100
0005569
1
2
Stutzen mit Griff verzinktØ100
0710-studs-airsystem
1
3
Fleksslange Ø100x200 mm SRFC2
0710-FLEKSSLANGE 4
1
4
Turning Table complete
10-0000-1501
1
5
2 x 380 x 380
Celleneopren Ø380x120x2 m/klæb
0005568
1
6
Established:
Designer: Project manager:
Format:
Approved:
Drawing no.:
Revision:
Project:
Drawing name:
INDUSTRIVEJ 20, 9900 FREDERIKSHAVN, DENMARK
Phone +45 98 47 90 33 - Fax +45 98 47 92 91
E-mail: [email protected] - Homepage: www.rais.dk
Corrections:
D M Y
ksj
Air through floor with Turntable
08-06-2018
A3
10-0000-8610
10
1
4
1
3
2
5
6
24 - GB
GB
Summary of Contents for VISIO 1
Page 13: ...12 GB GB ...
Page 31: ...30 GB GB ...
Page 32: ...DECLARATION OF PERFORMANCE DECLARATION OF PERFORMANCE GB 31 GB ...
Page 33: ...32 GB GB ...