
A
18"
H4
H55
281
282
N5
H167
N5
280
280
H3
H11
H17
H28
278
*NOTE: At least two people are required to complete this step.
1. Lift up entire Monkey Bar assembly and align pre-drilled holes in Monkey Bar Arms
(281) (282)
with pre-drilled holes in Top Joist with Monkey Bar Holes
(278)
and attach using 3/8" Hardware
(H3)
(H11) (H17) (H28) (H55)
and 1/2" Hardware
(H4)
.
*NOTE: Use an 1/8" drill bit to drill holes 1/2" deep for #14 Hardware (H167).
2. Measure down
18"
from the top of the Monkey Bar Support Legs
(280)
and attach Safety Handles
(N5)
to Monkey Bar Support Legs
(280)
using #14 Hardware
(H167)
.
45
Step 26
Monkey Bar Installation