Lastly, it is very important to conduct a thorough site survey which includes:
Confirming central grounding is installed to spec and tested for 10 ohms or less;
Confirming there is an available MAXI™ grounding plate (MGP1) mounting point
with MSP-1 installed
Checking the condition of the wire path where you will be adding ICMs
And to determine how many satellites are on the wire path and check capacity
7