14
RailKing Northern Operating Manual
RAILKING
sound of the freight car door closing. Within 2 seconds of the door closing,
the locomotive bell begins chiming. After approximately 8 chimes of the
bell, the engine begins moving in the forward phase with the bell continuing
to ring another 8 chimes before automatically
turning off. Once the bell turns off, the
operator regains control of the transformer
whistle and bell buttons and can ring the bell
or blow the whistle as usual.
Note:
When entering the Forward phase of
FYS, it is important to set the transformer
throttle at a high enough setting that will
allow the engine to begin moving once FYS automatically activates the
motors. Otherwise the engine will just sit still until you increase the
transformer throttle setting on the transformer. However, don’t set the
throttle setting too high or the engine will go racing away faster than you
might expect.
Listen For The Sound
Of Box Door Closing
Clunnkkk
Interrupt Throttle To
Enter The Next Phase
Summary of Contents for NORTHERN STEAM ENGINE
Page 28: ...RAILKING...