5
Super Cub MX Assembly
The Super Cub MX comes nearly ready-to-fly. All that
is required to complete is the installation of the
landing gear.
Insert the landing gear wire into the slot at the rear
of the battery box. The wheels should be raked for-
ward. The landing gear are held in place by friction, no
screws are necessary to retain.
Battery Install
Insert the battery into the battery box located on the
bottom of the fuselage. First, turn on the transmitter
with the throttle off (left transmitter stick all the way
down). Then plug in the connector, which will power
up the aircraft. Unplug the flight battery at the end of
each flight.
Transmitter Details
Throttle Stick
Elevator/Rudder
Stick
On/Off
Elevator Trim
Rudder Trim
Not Used
Not Used
Antenna
Handle
PASS Switch
Power LED
PLEASE NOTE: Install 4 AA batteries into the
battery compartment located on the back of
the transmitter, under the battery hatch cover.
Make sure that the batteries are installed with
correct polarity per the diagram inside the
battery compartment.
Install Transmitter Batteries
Summary of Contents for Super Cub MX
Page 12: ...2018 HRP Distributing Inc ...